Penonomé wind farm
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Other names: Laudato Si Phase 2 (Phases Nuevo Chagres Fase 2, Rosa de los Vientos), Laudato Si Phase 3 (Phases Marañón, Portobelo 1), Portobello Bastillas (Phase Portobelo 1)
Penonomé wind farm (Parque Eólico Penonomé) is an operating wind farm in Distrito Penonomé, Coclé, Panama.
Project Details
Table 1: Phase-level project details for Penonomé wind farm
Phase name | Status | Commissioning year | Nameplate capacity | Type | Owner | Operator |
---|---|---|---|---|---|---|
Marañón | Operating[1] | 2018[1] | 18 MW[1] | Onshore[2] | InterEnergy [100%][1][3] | InterEnergy[1][3] |
Nuevo Chagres Fase 1 | Operating[1] | 2018[1] | 55 MW[1] | Onshore[2] | AES Corp [100%][1][4] | AES[1][4] |
Nuevo Chagres Fase 2 | Operating[1] | 2018[1] | 62.5 MW[2] | Onshore[2] | InterEnergy [100%][1][3] | InterEnergy[1][3] |
Nuevo Chagres Fase 2.2 | Pre-construction[5] | 2025 (planned)[6] | 51.8 MW[5] | Onshore[5] | – | – |
Portobelo 1 | Operating[1] | 2018[1] | 32.5 MW[2] | Onshore[2] | InterEnergy [100%][1][3] | InterEnergy[1][3] |
Portobelo 2 | Pre-construction[5] | 2023 (planned)[5] | 17.2 MW[5] | Onshore[5] | – | – |
Rosa de los Vientos | Operating[1] | 2018[1] | 102.5 MW[2] | Onshore[2] | InterEnergy [100%][1][3] | InterEnergy[1][3] |
Location
Table 2: Phase-level location details for Penonomé wind farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
Marañón | Distrito Penonomé, Coclé, Panama[7] | 8.4606, -80.3584 (exact)[7] |
Nuevo Chagres Fase 1 | Distrito Penonomé, Coclé, Panama[7] | 8.4606, -80.3584 (exact)[7] |
Nuevo Chagres Fase 2 | Distrito Penonomé, Coclé, Panama[7] | 8.4606, -80.3584 (exact)[7] |
Nuevo Chagres Fase 2.2 | Distrito Penonomé, Coclé, Panama[5] | 8.4606, -80.3584 (approximate)[5] |
Portobelo 1 | Distrito Penonomé, Coclé, Panama[7] | 8.4606, -80.3584 (exact)[7] |
Portobelo 2 | Distrito Penonomé, Coclé, Panama[5] | 8.4606, -80.3584 (approximate)[5] |
Rosa de los Vientos | Distrito Penonomé, Coclé, Panama[7] | 8.4606, -80.3584 (exact)[7] |
The map below shows the locations of the wind farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 1.14 1.15 1.16 1.17 1.18 1.19 1.20 1.21 (PDF) https://web.archive.org/web/20240125174022/https://www.asep.gob.pa/wp-content/uploads/electricidad/concesiones_licencias/concesiones_licencias/2021/licencias_operacion_jul21.pdf. Archived from the original (PDF) on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 (PDF) https://web.archive.org/web/20240125174022/https://www.asep.gob.pa/wp-content/uploads/electricidad/concesiones_licencias/concesiones_licencias/2022/licencias_operacion_jul29.pdf. Archived from the original (PDF) on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 3.2 3.3 3.4 3.5 3.6 3.7 https://web.archive.org/web/20240131000823/https://interenergy.com/. Archived from the original on 31 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 https://web.archive.org/web/20240131000959/https://www.energiaestrategica.com/aes-panama-se-quedo-con-el-parque-eolico-de-goldwind-de-55-mw/. Archived from the original on 31 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.00 5.01 5.02 5.03 5.04 5.05 5.06 5.07 5.08 5.09 5.10 (PDF) https://web.archive.org/web/20240125174153/https://www.asep.gob.pa/wp-content/uploads/electricidad/concesiones_licencias/concesiones_licencias/2022/listado_licencias_jul29.pdf. Archived from the original (PDF) on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20240126160505/https://www.asep.gob.pa/wp-content/uploads/electricidad/concesiones_licencias/concesiones_licencias/2023/listado_licencias_may30.pdf. Archived from the original (PDF) on 26 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 7.0 7.1 7.2 7.3 7.4 7.5 7.6 7.7 7.8 7.9 https://web.archive.org/web/20210909195334/https://www.google.com.pe/maps/place/Parque+E%C3%B3lico+Penonome/@8.4569512,-80.362444,6477m/data=!3m1!1e3!4m6!3m5!1s0x8fac4f50f1cd2677:0x749a2a7c50c36f1!8m2!3d8.4606858!4d-80.3583379!15sChdQYXJxdWUgRcOzbGljbyBwZW5vbm9tZZIBD2VuZXJneV9zdXBwbGllcg?hl=es-419&shorturl=1. Archived from the original on 09 September 2021.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help)