Peres solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Peres solar farm is a solar photovoltaic (PV) farm in pre-construction in Saxony, Germany.
Project Details
Table 1: Phase-level project details for Peres solar farm
Phase name | Status | Commissioning year | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|---|---|
1900-01-02 00:00:00 | Pre-construction[1] | 2023 (planned)[1] | 37 MWp/dc[1] | PV[1] | Mitteldeutsche Braunkohlengesellschaft GMBH[1] | Mitteldeutsche Braunkohlengesellschaft GMBH[1] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Peres solar farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1900-01-02 00:00:00 | Saxony, Germany[1] | 51.1694, 12.3303 (approximate)[1] |
The map below shows the approximate location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 Germany Federal Network Agency (February 2023). "Marktstammdatenregister (Market master data register)". Marktstammdatenregister (Market master data register). Archived from the original on January 23, 2023. Retrieved February 2023.
{{cite web}}
: Check date values in:|access-date=
(help)