Perm CHP-14 power station (Пермская ТЭЦ-14) is an operating power station of at least 330-megawatts (MW) in Perm, Perm Krai, Russia with multiple units, some of which are not currently operating.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Perm CHP-14 power station | Perm, Perm Krai, Russia | 58.018928, 55.881863 (exact)[1] |
The map below shows the exact location of the power station.
Unit-level coordinates (WGS 84):
- 1, 2, 3, 4, 5, CC1: 58.018928, 55.881863
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year | Retired year |
---|---|---|---|---|---|---|---|
1 | Operating[2][3] | fossil gas: natural gas, fossil liquids: heavy fuel oil[4] | 60[3][5] | steam turbine[6] | yes[3] | 1966[3] | 2028 (planned)[2][7] |
2 | Operating[3] | fossil gas: natural gas, fossil liquids: heavy fuel oil[4] | 35[3][8][5] | steam turbine[6] | yes[3] | 1967[3] | – |
3 | Operating[3] | fossil gas: natural gas, fossil liquids: heavy fuel oil[4] | 50[3][8][5] | steam turbine[6] | yes[3] | 1967[8] | – |
4 | Operating[3] | fossil gas: natural gas, fossil liquids: heavy fuel oil[4] | 135[3][5] | steam turbine[6] | yes[3] | 2008[3] | – |
5 | Operating[2][8] | fossil gas: natural gas, fossil liquids: heavy fuel oil[2] | 50[8][5] | steam turbine[8] | yes[3] | 1979[8] | 2028 (planned)[2][7] |
CC1 | Announced[9][10][7][11][12][2][13] | fossil gas: natural gas[4] | 105[9][14][5] | combined cycle[14] | yes[3] | 2028 (planned)[5][9][7][2][15][16] | – |
CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
1 | T Plus PJSC Perm Branch [100%][3] | T Plus Group PJSC [100.0%] |
2 | T Plus PJSC Perm Branch [100%][3] | T Plus Group PJSC [100.0%] |
3 | T Plus PJSC Perm Branch [100%][3] | T Plus Group PJSC [100.0%] |
4 | T Plus PJSC Perm Branch [100%][3] | T Plus Group PJSC [100.0%] |
5 | T Plus PJSC Perm Branch [100%][3] | T Plus Group PJSC [100.0%] |
CC1 | T Plus PJSC Perm Branch [100%][3] | T Plus Group PJSC [100.0%] |
Background
Planned retirements
According to the Ministry of Energy (Minenergo) energy program for 2025-2030, released in November 2024, units 1 and 5 are expected to be retired in 2028.[17]
Unit CC1
The new combined cycle unit, 105 MW, was listed in the Ministry of Energy 2022-2028 energy program, released in February 2022.[18] As of March 2022, the company was still intending to go forward with this proposal.[19] The project was mentioned again in the Ministry of Energy 2023-2028 and 2024-2029 energy programs, and is expected to be completed in 2028.[20][21] The turbine for the project (GTE-65) was to by supplied by Russia's Power Machines. However, in January 2024 it was reported that T Plus was considering to give up the project, partly because it could not obtain the final price of the turbine.[22]
In September 2024, it was reported that the GTE-65 turbine was still in the production stage, with the prototype expected to be completed in the first half of 2025. Testing is planned for Q3 2026. Originally, it was anticipated that Power Machines would complete this unit by the end of 2024, but the timeline has been adjusted to accommodate production and development requirements.[23] The project is still listed in the Scheme and Program for the Development of Electric Power System of Russia for 2025–2030, published by the Ministry of Energy in November 2024, with the commissioning deadline in 2028. As of December 2024, there have not been any further updates.[24]
Articles and Resources
References
- ↑ https://web.archive.org/web/20210615133708/https://www.industryabout.com/country-territories-3/2137-russia/fossil-fuels-energy/32738-permskaya-tec-14-gas-power-plant. Archived from the original on 15 June 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 2.4 2.5 2.6 https://web.archive.org/web/20221130155326/https://www.garant.ru/products/ipo/prime/doc/404487690/. Archived from the original on 30 November 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.00 3.01 3.02 3.03 3.04 3.05 3.06 3.07 3.08 3.09 3.10 3.11 3.12 3.13 3.14 3.15 3.16 3.17 3.18 3.19 3.20 3.21 3.22 https://web.archive.org/web/20220102151921/https://www.tplusgroup.ru/org/perm/organization/permskaja-chp14/. Archived from the original on 02 January 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 4.0 4.1 4.2 4.3 4.4 https://energybase.ru/power-plant/Perm_CHP-14.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 5.2 5.3 5.4 5.5 5.6 (PDF) https://web.archive.org/web/20230313035722/https://www.so-ups.ru/fileadmin/files/company/future_plan/public_discussion/2023/final/38_Permskii_krai_fin.pdf. Archived from the original (PDF) on 13 March 2023.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 6.0 6.1 6.2 6.3 https://web.archive.org/web/20220102151921/https://www.tplusgroup.ru/org/perm/organization/permskaja-chp14/. Archived from the original on 02 January 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 7.0 7.1 7.2 7.3 (PDF) https://web.archive.org/web/20240120035218/https://www.bigpowernews.ru/photos/0/0_hwMWLFCE8gF4WY3kGoos5DkyfTCuFMXM.pdf. Archived from the original (PDF) on 20 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 8.0 8.1 8.2 8.3 8.4 8.5 8.6 https://web.archive.org/web/20210830223039/https://www.rosteplo.ru/w/%D0%9F%D0%B5%D1%80%D0%BC%D1%81%D0%BA%D0%B0%D1%8F_%D0%A2%D0%AD%D0%A6-14. Archived from the original on 30 August 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 9.0 9.1 9.2 https://web.archive.org/web/20210801171939/https://www.kommersant.ru/doc/4926186. Archived from the original on 01 August 2021.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220810204223/https://www.kommersant.ru/doc/4817773. Archived from the original on 10 August 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20230803101842/https://www.business-vector.info/t-pljus-minus-vagner-161332/. Archived from the original on 03 August 2023.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ https://www.so-ups.ru/news/press-release/press-release-view/news/21226/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.eprussia.ru/news/base/2023/2318386.htm.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 14.0 14.1 https://web.archive.org/web/20220708170828/https://59.ru/text/gorod/2022/03/14/70506986/. Archived from the original on 08 July 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20230323061102/https://tass.ru/v-strane/17343395. Archived from the original on 23 March 2023.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://www.so-ups.ru/fileadmin/files/company/future_plan/public_discussion/2024/final/39_Permskii_krai.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ "Обосновывающие материалы к СиПР ЭЭС России на 2025-2030 годы". SO UPS of Russia. November 29, 2024. Retrieved December 5, 2024.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Приказ Министерства энергетики РФ от 28 февраля 2022 г. № 146 "Об утверждении схемы и программы развития Единой энергетической системы России на 2022 - 2028 годы"". Garant.ru. Feb 28, 2022. Retrieved Oct 31, 2022.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "В 2022 году «Т Плюс» повысит надежность работы ТЭЦ в Пермском крае". 59.ru. Mar 14, 2022. Retrieved Apr 21, 2022.
- ↑ "СХЕМА И ПРОГРАММА РАЗВИТИЯ ЭЛЕКТРОЭНЕРГЕТИЧЕСКИХ СИСТЕМ РОССИИ НА 2023–2028 ГОДЫ ПЕРМСКИЙ КРАЙ" (PDF). SO UPS of Russia. February 28, 2023. Retrieved November 30, 2023.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "СХЕМА И ПРОГРАММА РАЗВИТИЯ ЭЛЕКТРОЭНЕРГЕТИЧЕСКИХ СИСТЕМ РОССИИ НА 2024–2029 ГОДЫ. ЭНЕРГОСИСТЕМА ПЕРМСКОГО КРАЯ" (PDF). SO UPS of Russia. November 30, 2023. Retrieved May 6, 2024.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Ъ: «Т Плюс» хочет отказаться от проектов модернизации ТЭЦ с турбинами «Силмаша»". peretok.ru. January 22, 2024. Retrieved May 6, 2024.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Энергетикам отменят льготы для отечественных турбин при модернизации ТЭС". РБК. September 30, 2024. Retrieved December 5, 2024.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Обосновывающие материалы к СиПР ЭЭС России на 2025-2030 годы". SO UPS of Russia. November 29, 2024. Retrieved December 5, 2024.
{{cite web}}
: CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.