Pesteana Coal Mine
This article is part of the Global Coal Mine Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Related-articles: |
Pesteana Coal Mine is an operating coal mine in Motru, Rovinari, Oltenia, Romania.
Location
Table 1: Project-level location details
Mine Name | Location | Coordinates (WGS 84) |
---|---|---|
Pesteana Coal Mine | Motru, Rovinari, Oltenia, Romania | 44.840972, 23.274306 (exact) |
The map below shows the exact location of the coal mine:
Project Details
Table 2: Project status
Status | Status Detail | Opening Year | Closing Year |
---|---|---|---|
Operating | – | 1980 | – |
Table 3: Operation details
Capacity (Mtpa) | Production (Mtpa) | Year of Production | Mine Type | Mining Method | Mine Size (km2) | Mine Depth (m) | Workforce Size |
---|---|---|---|---|---|---|---|
– | 1.6[1] | – | Surface | Open Pit | 18 | 50* | 738[2] |
Table 4: Coal resources and destination
Total Reserves (Mt) | Year of Total Reserves Recorded | Total Resources (Mt) | Coalfield | Coal Type | Coal Grade | Primary Consumer/ Destination |
---|---|---|---|---|---|---|
– | – | – | Oltenia | Lignite | Thermal | – |
Table 5: Ownership and parent company
Owner | Parent Company | Headquarters |
---|---|---|
Complexul Energetic Oltenia SA[3] | Ministry of Energy (Romania) [77.2%]; Fondul Proprietatea SA [21.6%]; other unknown/mixed entity types [1.3%] | Romania |
Table 6: Historical production (unit: million tonnes per annum)
ROM or Saleable | 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 |
---|---|---|---|---|---|---|---|
ROM | – | – | – | – | – | – | – |
Note: The above section was automatically generated and is based on data from the Global Coal Mine Tracker April 2024 release and the September and December supplements.
Background
The Oltenia Energy Complex is a network of coal mines and power plants, operated by Complexul Energetic Oltenia S.A., in Gorj, Vâlce, and Mehedinţi, Romania.
Between 2017 and 2021, Oltenia Energy Complex had an average annual production of approximately 18.5 million tonnes of lignite from the ten mines it operates.[4] In 2022, production of the complex reached 18.2 million tonnes.[5]
The company operates ten pits.[6][4] The complex has closed several other pits over the years.[7] The Oltenia Energy Complex was established in 2012 by merging Societatea Naţionala a Lignitului Oltenia with Energy Complexes Turceni, Rovinari and Craiova. The company has its material base in Gorj, Vâlcea and Mehedinţi counties with total reserves of 2 billion tonnes of coal.[8]
A Restructuring Plan for the Oltenia Energy Complex was approved by the European Commission in January 2022 which anticipated the phased closure of Husnicioara, Peșteana and Lupoaia quarries and the transition to conservation of Tismana and Jilt Sud from 2026.[9]
More information is available under Oltenia Energy Complex
Pesteana
The mine was planned for closure, according to government announcements in 2022, together with Husnicioara and Lupoaia.[9] Euracoal report from January 2024 did not specifically mention this coal mine but referred to Roşia-Peșteana coal mine planned for closure by the end of 2030.[6] (the surface mines are located 10km away from each other).
Additional media sources from September 2021 stated that the last works at Pesteana were scheduled by the end of 2021 and the mine was planned for closure in January 2022.[10] Pesteana Sud was closed earlier in 2015 and on its site a huge lake was formed. [11] However, media sources from late 2023 suggest that the mine was still operational.[12][13]
It appeared that the mine stopped extracting coal in late 2024.[14][15] As of December 2024, the mine entered the process of closing, according to the restructuring plan of CE Oltenia. Coal is no longer extracted from the mining unit, but work is being done to extract the equipment, in view of the final closure. It was not known what will happen to the staff, when the closure works will be completed, but, most likely, they will be moved to the Rosia Coal Mine.[14] Closure works are scheduled between 2024 and 2032 with a plan to conduct re-cultivation works. There were 104 employees left that were expected to stay at the mine for the closure works.[15]
Articles and Resources
Additional data
To access additional data, including an interactive map of world coal mines, a downloadable dataset, and summary data, please visit the Global Coal Mine Tracker on the Global Energy Monitor website.
References
- ↑ (no source available)
- ↑ https://www.ceoltenia.ro/en/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.ceoltenia.ro/en/business/piata-de-carbune/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 "Romania plans to expand coal mine over 100 hectares of forests". balkangreenenergynews.com. January 2023.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Romania-Country Profile". https://euracoal.eu/. January 2024.
{{cite web}}
: External link in
(help)CS1 maint: url-status (link)|website=
- ↑ 6.0 6.1 "Romania - Country Profile". /euracoal.eu/. January 2024.
{{cite web}}
: CS1 maint: url-status (link) - ↑ Report International, EKO UNIA
- ↑ ROEC,Complexul Energetic Oltenia, accessed September 2020
- ↑ 9.0 9.1 "Planul de restructurare a Complexului Energetic Oltenia a fost aprobat de Comisia Europeană. Compania va beneficia de 2,7 miliarde de euro," Targu Jiu, January 27, 2022
- ↑ "Ultimele lucrări la Cariera Peșteana care se va închide în ianuarie". www.gorjonline.ro. September 2021.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "ULTIMA ORĂFOTO. Lac imens pe locul fostei cariere de lignit Peșteana Sud!". www.gorjexpress.ro/. January 2023.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Tensiuni în carierele CE Oltenia. Ce a discutat senatorul Iordache cu minerii de la Peșteana". www.gorjonline.ro. November 2023.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Ion Iordache a mers la Cariera Peșteana". /www.youtube.com/. November 2023.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 14.0 14.1 "Câți mineri mai lucrează la Cariera Peșteana". www.gorjonline.ro. December 2024.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 15.0 15.1 "https://www.pandurul.ro/articol/ultimii-104-angajati-ei-vor-munci-la-inchiderea-ca_177529.html#google_vignette". /www.pandurul.ro/. October 2024.
{{cite web}}
: External link in
(help)CS1 maint: url-status (link)|title=