Peusangan 4 hydroelectric plant

From Global Energy Monitor
Part of the
Global Hydropower Tracker,
a Global Energy Monitor project.
Report an error

Peusangan 4 hydroelectric plant is a hydroelectric power plant in pre-construction in Takengon Timur Village, Lut Tawar District, Central Aceh Regency, Aceh Province, Indonesia.

Project Details

Table 1: Project details for Peusangan 4 hydroelectric plant

Status Nameplate capacity Technology type Owner
Pre-construction[1] 120 MW[1] Run-of-river[1] Hyundai Engineering & Construction CO LTD [30%]; Korea South-East Power CO LTD (KOEN) [25%]; PT Wijaya Karya (Persero) [25%]; IGIS Asset Management [20%][2]

Location

Table 2: Location details for Peusangan 4 hydroelectric plant

Location Coordinates (WGS 84)
Takengon Timur Village, Lut Tawar District, Central Aceh Regency, Aceh Province, Indonesia[2][1] 4.6242, 96.8501 (approximate)[1]

The map below shows the approximate location of the hydroelectric power plant:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global nuclear power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 https://www.power-technology.com/marketdata/peusangan-iv-indonesia/. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 https://worldlens.home.blog/2019/01/29/agree-on-the-peusangan-4-hydroelectric-power-plant-development-project-between-wika-and-korean-companies/. {{cite web}}: Missing or empty |title= (help)