Peusangan 4 hydroelectric plant
From Global Energy Monitor
Part of the Global Hydropower Tracker, a Global Energy Monitor project. |
Peusangan 4 hydroelectric plant is a hydroelectric power plant in pre-construction in Takengon Timur Village, Lut Tawar District, Central Aceh Regency, Aceh Province, Indonesia.
Project Details
Table 1: Project details for Peusangan 4 hydroelectric plant
Status | Nameplate capacity | Technology type | Owner |
---|---|---|---|
Pre-construction[1] | 120 MW[1] | Run-of-river[1] | Hyundai Engineering & Construction CO LTD [30%]; Korea South-East Power CO LTD (KOEN) [25%]; PT Wijaya Karya (Persero) [25%]; IGIS Asset Management [20%][2] |
Location
Table 2: Location details for Peusangan 4 hydroelectric plant
Location | Coordinates (WGS 84) |
---|---|
Takengon Timur Village, Lut Tawar District, Central Aceh Regency, Aceh Province, Indonesia[2][1] | 4.6242, 96.8501 (approximate)[1] |
The map below shows the approximate location of the hydroelectric power plant:
Articles and Resources
Additional data
To access additional data, including an interactive map of global nuclear power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 https://www.power-technology.com/marketdata/peusangan-iv-indonesia/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 https://worldlens.home.blog/2019/01/29/agree-on-the-peusangan-4-hydroelectric-power-plant-development-project-between-wika-and-korean-companies/.
{{cite web}}
: Missing or empty|title=
(help)