Phandar hydroelectric plant

From Global Energy Monitor
Part of the
Global Hydropower Tracker,
a Global Energy Monitor project.
Report an error

Phandar hydroelectric plant is a hydroelectric power plant in pre-construction in Phander Village, Phander, Gupis-Yasin District, Gilgit-Baltistan, Pakistan.

Project Details

Table 1: Project details for Phandar hydroelectric plant

Status Nameplate capacity Turbines Technology type Owner
Pre-construction[1] 80 MW[1] 4 x 20 MW[2] Run-of-river[2] Pakistan Water and Power Development Authority[2]

Location

Table 2: Location details for Phandar hydroelectric plant

Location River Coordinates (WGS 84)
Phander Village, Phander, Gupis-Yasin District, Gilgit-Baltistan, Pakistan[1] Ghizer River[1] 36.0, 75.0 (approximate)[1]

The map below shows the approximate location of the hydroelectric power plant:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global nuclear power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 https://web.archive.org/web/20221019155802/http://www.wapda.gov.pk/index.php/projects/hydro-power/future/phandar. Archived from the original on 19 October 2022. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 https://www.power-technology.com/marketdata/phandar-pakistan/. {{cite web}}: Missing or empty |title= (help)