Phandar hydroelectric plant
From Global Energy Monitor
Part of the Global Hydropower Tracker, a Global Energy Monitor project. |
Phandar hydroelectric plant is a hydroelectric power plant in pre-construction in Phander Village, Phander, Gupis-Yasin District, Gilgit-Baltistan, Pakistan.
Project Details
Table 1: Project details for Phandar hydroelectric plant
Status | Nameplate capacity | Turbines | Technology type | Owner |
---|---|---|---|---|
Pre-construction[1] | 80 MW[1] | 4 x 20 MW[2] | Run-of-river[2] | Pakistan Water and Power Development Authority[2] |
Location
Table 2: Location details for Phandar hydroelectric plant
Location | River | Coordinates (WGS 84) |
---|---|---|
Phander Village, Phander, Gupis-Yasin District, Gilgit-Baltistan, Pakistan[1] | Ghizer River[1] | 36.0, 75.0 (approximate)[1] |
The map below shows the approximate location of the hydroelectric power plant:
Articles and Resources
Additional data
To access additional data, including an interactive map of global nuclear power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 https://web.archive.org/web/20221019155802/http://www.wapda.gov.pk/index.php/projects/hydro-power/future/phandar. Archived from the original on 19 October 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 https://www.power-technology.com/marketdata/phandar-pakistan/.
{{cite web}}
: Missing or empty|title=
(help)