Pickwick Landing hydroelectric plant
From Global Energy Monitor
Part of the Global Hydropower Tracker, a Global Energy Monitor project. |
Pickwick Landing hydroelectric plant is an operating hydroelectric power plant in Pickwick Dam, Hardin County, Tennessee, United States.
Project Details
Table 1: Project details for Pickwick Landing hydroelectric plant
Status | Commissioning year | Nameplate capacity | Turbines | Technology type | Owner | Operator |
---|---|---|---|---|---|---|
Operating[1] | 1938[1] | 240 MW[1] | 6 x 40 MW[1] | Conventional storage[1] | Tennessee Valley Authority (TVA) [100%][2] | Tennessee Valley Authority[3] |
Location
Table 2: Location details for Pickwick Landing hydroelectric plant
Location | River | Coordinates (WGS 84) |
---|---|---|
Pickwick Dam, Hardin County, Tennessee, United States[1][3] | Tennessee River[3] | 35.0683, -88.2494 (exact)[1][3] |
The map below shows the exact location of the hydroelectric power plant:
Articles and Resources
Additional data
To access additional data, including an interactive map of global hydroelectric power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 https://web.archive.org/web/20240928140622/https://www.eia.gov/electricity/data/eia860m/archive/xls/november_generator2022.xlsx. Archived from the original on 2024-09-28.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20230128160641/https://www.tva.com/energy/our-power-system/hydroelectric/pickwick-landing. Archived from the original on 2023-01-28.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 3.2 3.3 "U.S. Energy Information Administration, Form EIA-860 detailed data with previous form data (EIA-860A/860B), 2012". Archived from the original on 2022-10-28. Retrieved 2023-11-01 00:00:00.
{{cite web}}
: Check date values in:|access-date=
(help)