Piekło wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Piekło wind farm is a wind farm under construction in Gmina Międzychód, Międzychód, Greater Poland Voivodeship, Poland.

Project Details

Table 1: Phase-level project details for Piekło wind farm

Status Commissioning year Nameplate capacity Type Owner
Construction[1] 2023 (planned)[1] 13 MW[2] Onshore[1] Polenergia SA[2]

Location

Table 2: Phase-level location details for Piekło wind farm

Location Coordinates (WGS 84)
Gmina Międzychód, Międzychód, Greater Poland Voivodeship, Poland[2] 53.9298, 18.8733 (approximate)[2]

The map below shows the approximate location of the wind farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 https://www.polenergia.pl/fw-pieklo/. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 https://www.polenergia.pl/en/our-assets/production/onshore-wind-farms/pieklo-wind-farm/. {{cite web}}: Missing or empty |title= (help)