Pinoasa Coal Mine is an operating coal mine in Motru, Rovinari, Oltenia, Romania.
Location
Table 1: Project-level location details
Mine Name | Location | Coordinates (WGS 84) |
---|---|---|
Pinoasa Coal Mine | Motru, Rovinari, Oltenia, Romania | 44.888444, 23.121639 (exact) |
The map below shows the exact location of the coal mine:
Project Details
Table 2: Project status
Status | Status Detail | Opening Year | Closing Year |
---|---|---|---|
Operating | – | 1980 | 2030 (planned)[1] |
Table 3: Operation details
Capacity (Mtpa) | Production (Mtpa) | Year of Production | Mine Type | Mining Method | Mine Size (km2) | Mine Depth (m) | Workforce Size |
---|---|---|---|---|---|---|---|
– | 2*[2] | 2023 | Surface | Open Pit | 15.8 | 50* | 535[3] |
Table 4: Coal resources and destination
Total Reserves (Mt) | Year of Total Reserves Recorded | Total Resources (Mt) | Coalfield | Coal Type | Coal Grade | Primary Consumer/ Destination |
---|---|---|---|---|---|---|
– | – | – | Oltenia | Lignite | Thermal | – |
Table 5: Ownership and parent company
Owner | Parent Company | Headquarters |
---|---|---|
Complexul Energetic Oltenia SA[4] | Ministry of Energy (Romania) [77.2%]; Fondul Proprietatea SA [21.6%]; other unknown/mixed entity types [1.3%] | Romania |
Table 6: Historical production (unit: million tonnes per annum)
ROM or Saleable | 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 |
---|---|---|---|---|---|---|---|
ROM | – | – | – | – | – | – | 2*[2] |
Note: The above section was automatically generated and is based on data from the Global Coal Mine Tracker April 2024 release and the September and December supplements.
Background
The Oltenia Energy Complex is a network of coal mines and power plants, operated by Complexul Energetic Oltenia S.A., in Gorj, Vâlce, and Mehedinţi, Romania.
Between 2017 and 2021, Oltenia Energy Complex had an average annual production of approximately 18.5 million tonnes of lignite from the ten mines it operates.[5] In 2022, production of the complex reached 18.2 million tonnes.[6]
The complex produces 99% of the country's lignite - 18.2 million tonnes in 2022.[7]
The company operates ten pits.[7][5] The complex has closed several other pits over the years.[8] The Oltenia Energy Complex was established in 2012 by merging Societatea Naţionala a Lignitului Oltenia with Energy Complexes Turceni, Rovinari and Craiova. The company has its material base in Gorj, Vâlcea and Mehedinţi counties with total reserves of 2 billion tonnes of coal.[9]
A Restructuring Plan for the Oltenia Energy Complex was approved by the European Commission in January 2022 which anticipated the phased closure of Husnicioara, Peșteana and Lupoaia quarries and the transition to conservation of Tismana and Jilt Sud from 2026.[10]
More information on the complex is under Oltenia Energy Complex.
Pinoasa
Eurocal report referred to the planned for closure of the Pinoasa coal mine by the end of 2030.[7] The same timeline was mentioned in a media report from October 2023.[11]
In January 2023, the Romanian government adopted the decision to cut down a 106-hectare forest without compensation to expand the Timiseni-Pinoasa lignite mine, according to Bankwatch report. This would increase output of the mine up to 8 million tonnes per year, which is almost half of the total 2021 production of Oltenia. The decision runs counter the decarbonization process approved by the government earlier.[12] The project has been in the works since 2019, according to another report, and the removal of the 106-hectare forecst is the last important step before moving on to mining.[13]
In August 2024, a landslide occurred in the Pinoasa sector, bringing large blocks of rock that affected the working steps and reached the parking and transportation platform of the equipment on the quarry hearth.[2] The labour inspection authorities have ordered to stop the exploitation activity in the Pinoasa quarry after the weekend accident, when two excavators were swallowed by the earth. Mining activity was to stop until the safety and health concerns are remedied. The excavators will no longer be able to be used because they have been completely damaged.[14] It appeared that there were no casualties. The production of the mine was expected to return to about 170,000 tonnes per month in September.[2]
Articles and Resources
Additional data
To access additional data, including an interactive map of world coal mines, a downloadable dataset, and summary data, please visit the Global Coal Mine Tracker on the Global Energy Monitor website.
References
- ↑ https://euracoal.eu/info/country-profiles/romania-8/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 "Burduja anunță că incidentul de la cariera Pinoasa va fi lămurit în curând". romanialibera.ro/. August 2024.
{{cite web}}
: CS1 maint: url-status (link) - ↑ https://www.ceoltenia.ro/en/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.ceoltenia.ro/en/business/piata-de-carbune/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 "Romania plans to expand coal mine over 100 hectares of forests". balkangreenenergynews.com. January 2023.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Romania-Country Profile". https://euracoal.eu/. January 2024.
{{cite web}}
: External link in
(help)CS1 maint: url-status (link)|website=
- ↑ 7.0 7.1 7.2 "Romania - Country Profile". /euracoal.eu/. January 2024.
{{cite web}}
: CS1 maint: url-status (link) - ↑ Report International, EKO UNIA
- ↑ ROEC,Complexul Energetic Oltenia, accessed September 2020
- ↑ "Planul de restructurare a Complexului Energetic Oltenia a fost aprobat de Comisia Europeană. Compania va beneficia de 2,7 miliarde de euro," Targu Jiu, January 27, 2022
- ↑ "CEO pregătește închiderea carierei unde au murit 3 mineri". www.gds.ro. October 2023.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Romania plans to expand coal mine over 100 hectares of forests". balkangreenenergynews.com/. January 2023.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Defrișări | 100 de hectare de fond forestier din Gorj se transformă în carieră de cărbune". /romania.europalibera.org. January 2023.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "ITM GORJ A ÎNCHIS CARIERA PINOASA". www.youtube.com. August 2024.
{{cite web}}
: CS1 maint: url-status (link)