Plandiste 1 wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Plandiste 1 wind farm is a wind farm in pre-construction in Plandiste, Vojvodina, Serbia.

Project Details

Table 1: Phase-level project details for Plandiste 1 wind farm

Status Nameplate capacity Type Owner Operator
Pre-construction[1] 102 MW[2] Onshore[3] NIS; MET Renewables AG[4][4] NIS MET Energowind DOO[2]

Location

Table 2: Phase-level location details for Plandiste 1 wind farm

Location Coordinates (WGS 84)
Plandiste, Vojvodina, Serbia[3] 45.2289, 21.1235 (approximate)[3]

The map below shows the approximate location of the wind farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. https://web.archive.org/web/20240311185603/https://balkangreenenergynews.com/map-of-power-plants-under-development-in-serbia-that-await-transmission-grid-connection/. Archived from the original on 11 March 2024. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 https://web.archive.org/web/20240126041732/https://balkangreenenergynews.com/nis-met-renewables-to-start-building-102-mw-plandiste-wind-farm-during-2019/. Archived from the original on 26 January 2024. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 (PDF) https://web.archive.org/web/20210618011635/https://balkanenergy.com/files/Country-Report-Serbia-December-2020.pdf. Archived from the original (PDF) on 18 June 2021. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 https://web.archive.org/web/20230125231900/https://ir.nis.rs/news/single-news/swiss-met-group-and-nis-to-build-wind-park-near-plandiste/. Archived from the original on 25 January 2023. {{cite web}}: Missing or empty |title= (help)