Pohénégamook–Picard–Saint-Antonin–Wolastokuk wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Other names: PPAW Wind Energy Centre

Pohénégamook–Picard–Saint-Antonin–Wolastokuk wind farm is a wind farm in pre-construction in Canada.

Project Details

Table 1: Phase-level project details for Pohénégamook–Picard–Saint-Antonin–Wolastokuk wind farm

Phase name Status Commissioning year Nameplate capacity Type Owner
1 Pre-construction[1] 2026 (planned)[1] 350 MW[1] Onshore[1] Invenergy LLC; Alliance de l'Énergie de l'Est[2]
2 Announced[3] 2029 (planned)[4] 291 MW[4] Onshore[1] Invenergy LLC; Alliance de l'Énergie de l'Est[2]

Location

Table 2: Phase-level location details for Pohénégamook–Picard–Saint-Antonin–Wolastokuk wind farm

Phase Name Location Coordinates (WGS 84)
1 Canada[1] 47.6829, -69.3818 (approximate)[1]
2 Canada[1] 47.6829, -69.3818 (approximate)[1]

The map below shows the approximate locations of the wind farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 "Homepage - Leading Light Wind". PPAW (English). Archived from the original on 2024-06-13. Retrieved 2024-06-12.
  2. 2.0 2.1 https://ppawwind.invenergy.com/ https://ppawwind.invenergy.com/, https://ppawwind.invenergy.com/. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  3. https://web.archive.org/web/20240613205032/https://montrealgazette.com/business/energy/hydro-quebec-approves-eight-wind-projects-that-could-generate-1550-megawatts. Archived from the original on 2024-06-13. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 "Invenergy". invenergy.com. Archived from the original on 2024-06-13. Retrieved 2024-06-12. {{cite web}}: Text "Innovators in renewable and clean energy" ignored (help)