Polar power station
Part of the Global Oil and Gas Plant Tracker, a Global Energy Monitor project. |
Related categories: |
Polar power station (Полярная ГТЭС) is an operating power station of at least 144-megawatts (MW) in Sovetskaya Rechka, Turukhansky, Krasnoyarsk Krai, Russia. It is also known as Polyarnaya.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Polar power station | Sovetskaya Rechka, Turukhansky, Krasnoyarsk Krai, Russia | 67.729017, 83.438819 (exact)[1] |
The map below shows the exact location of the power station.
Unit-level coordinates (WGS 84):
- 1, 2: 67.729017, 83.438819
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year |
---|---|---|---|---|---|---|
1 | Operating[2][3][4][5][6] | fossil gas: natural gas[5][7] | 72[5][8][9] | gas turbine[5][7] | no[10] | 2023[11][7][3][4][5][8][9] |
2 | Operating[11][2][3][4][5][6] | fossil gas: natural gas[5][7] | 72[5][8][9] | gas turbine[5][7] | no[10] | 2023[11][7][3][4][5][8][9] |
CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
1 | RN-Vankor LLC [100%][5][2] | Rosneft PJSC [100.0%] |
2 | RN-Vankor LLC [100%][5][2] | Rosneft PJSC [100.0%] |
Project-level captive use details
- Captive industry: Oil & Refining[12]
Background
The site preparation for the power station (construction of the pile foundation) started in March 2017.[13][14] It appears that construction was halted in 2017 due to technical difficulties. The two gas turbine units with a capacity of 75 MW each and related equipment were delivered to the Vankor field in 2016 .[15] This plant is expected to provide power for the to the oil and gas fields of the Vankor cluster belonging to Rosneft - Suzunsky, Tagulsky and Lodochnoye, which are at different stages of development.[15] In February 2019, additional construction supplies were delivered to the construction site.[16]
Although the plant is still mentioned in the news after 2019, there doesn't appear to be any progress related to the plant's construction since February 2019, indicating that the project is possibly shelved.[16] However, the project was still included in the Ministry of Energy of Russia Energy Program for 2021-2027, published in February 2021, with the expected start-up date of 2022.[17] Since only the pile foundation has been constructed (early site preparation) and no equipment or building has yet been installed, the status is "pre-construction".[13][14] The project was once again included in the Ministry of Energy of Russia Energy Program for 2022-2028, published in February 2022, with the expected start-up date of 2022[18] and in the Ministry of Energy of Russia Energy Program for 2023-2028, published in February 2023, with the expected start-up date of 2023. There are no recent news reports since then related to construction.
According to the report published by NEK Engineering (contractor) in August 2023, the station began operating.[19] The Russian Ministry of Energy 2024-2029 energy program lists the station as operating. According to the document, Unit 1 was launched in June 2023 and Unit 2 in September 2023.[20]
Articles and Resources
References
- ↑ https://energybase.ru/power-plant/Polar_GTPP.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 https://web.archive.org/web/20210909163008/https://www.rosneft.ru/press/news/item/193903/. Archived from the original on 09 September 2021.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 3.0 3.1 3.2 3.3 (PDF) https://web.archive.org/web/20230313060430/https://www.so-ups.ru/fileadmin/files/company/future_plan/public_discussion/2023/final/23_Krasnojarskii_krai_fin.pdf. Archived from the original (PDF) on 13 March 2023.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 4.2 4.3 https://web.archive.org/web/20221130155326/https://www.garant.ru/products/ipo/prime/doc/404487690/. Archived from the original on 30 November 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.00 5.01 5.02 5.03 5.04 5.05 5.06 5.07 5.08 5.09 5.10 5.11 https://web.archive.org/web/20210908202213/https://minenergo.gov.ru/system/download-pdf/20706/156298. Archived from the original on 08 September 2021.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 6.0 6.1 https://web.archive.org/web/20220708161323/http://www.energyland.info/news-show-tek-electro-182868. Archived from the original on 08 July 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 7.0 7.1 7.2 7.3 7.4 7.5 https://web.archive.org/web/20211102081834/https://bbgl.ru/news/10501. Archived from the original on 02 November 2021.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 8.0 8.1 8.2 8.3 https://www.nekeng.ru/2023/08/02/okazanie-uslug-po-operativnomu-upravleniyu-polyarnoj-gtes-150-mvt-na-vankorskom-mestorozhdenii/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 9.0 9.1 9.2 9.3 (PDF) https://web.archive.org/web/20240116200857/https://www.so-ups.ru/fileadmin/files/company/future_plan/public_discussion/2024/final/23_Krasnojarskii_krai.pdf. Archived from the original (PDF) on 16 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 10.0 10.1 https://web.archive.org/web/20221004194040/http://irao-engineering.ru/ru/projects/polyarnaya-gtes/. Archived from the original on 04 October 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 11.0 11.1 11.2 https://web.archive.org/web/20240120035048/https://base.garant.ru/406504497/. Archived from the original on 20 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://nangs.org/news/upstream/kompaniya-eks-vitse-spikera-gosdumy-tormozit-razvitie-vankorskogo-mestorozhdeniya.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 13.0 13.1 "bbgl.ru/news/10501". Archived from the original on September 9, 2021.
- ↑ 14.0 14.1 "На Ванкорском месторождении началось строительство свайного основания ГТЭС "Полярная"". Angi.ru. Mar 23, 2017. Retrieved Apr 26, 2022.
- ↑ 15.0 15.1 Cite error: Invalid
<ref>
tag; no text was provided for refs namedref_6
- ↑ 16.0 16.1 "«Мосэлектро» изготовило токопроводы для строительства ГТЭС «Полярная» на Ванкорском месторождении". Archived from the original on July 8, 2022. Retrieved July 13, 2022.
- ↑ "minenergo.gov.ru/system/download-pdf/20706/156298". Archived from the original on September 8, 2021.
- ↑ https://web.archive.org/web/20221130155326/https://www.garant.ru/products/ipo/prime/doc/404487690/.
{{cite web}}
:|archive-url=
requires|archive-date=
(help); Missing or empty|title=
(help) - ↑ "Оказание услуг по оперативному управлению Полярной ГТЭС 150 МВт на Ванкорском месторождении". НЭК Инжиниринг. August 2, 2023. Retrieved December 1, 2023.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "СХЕМА И ПРОГРАММА РАЗВИТИЯ ЭЛЕКТРОЭНЕРГЕТИЧЕСКИХ СИСТЕМ РОССИИ НА 2024–2029 ГОДЫ ЭНЕРГОСИСТЕМА КРАСНОЯРСКОГО КРАЯ И РЕСПУБЛИКИ ТЫВА" (PDF). SO UPS of Russia. November 30, 2023. Retrieved December 8, 2023.
{{cite web}}
: CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.