Prakash Sponge Iron and Power Challakere Steel Plant

From Global Energy Monitor
This article is part of the
Global Iron and Steel Tracker, a project of Global Energy Monitor.
Download full dataset
Report an error
Sub-articles:

Prakash Sponge Iron and Power Challakere Steel Plant is a steel plant in Challakere, Heggere, Chitradurga, Karnataka, India that operates direct reduced iron (DRI), steelmaking, and electric arc furnace (EAF) technology.

Location

The map below shows the exact location of the plant in Challakere, Heggere, Chitradurga, Karnataka, India:

Loading map...
  • Location: Villages: Heggere & Kaparahalli, Taluk: Challakere, District: Chitradurga, Karnataka, India
  • Coordinates (WGS 84): 14.152912, 76.665824 (exact)

Background

Prakash Industries Ltd was established in 1980.[1] Prakash Sponge Iron and Power Pvt Ltd was incorporated in 10 September 2007.[2] The company currently operates a DRI plant and induction furnaces at the plant. It has currently proposed the expansion of sponge iron production from 90 ttpa to 1,118 ttpa and steel capacity from 130 ttpa to 784 ttpa.[3][4]

The public hearing for the proposed epxansion was conducted on 08 September 2023.[5]

Plant Details

Table 1: General Plant Details

Announced date Power source Iron ore source Coal source
2010[6] WHRB (7.1 MW operating, 66 MW proposed); 37 MW FBC proposed[7] Own mines and external purchase fromKarnataka and Odisha[6] SCCL, CIL, Indonesia, South Africa, Australia[7]

Table 2: Ownership and Parent Company Information

Parent company Parent company PermID Parent company GEM ID Owner Owner company PermID Owner company GEM ID
Prakash Sponge Iron and Power Pvt Ltd [100.0%] 5082001234 [100.0%] E100001012047 [100.0%] Prakash Sponge Iron and Power Pvt Ltd [100%][8] 5082001234 E100001012047 [100%]

Table 3: Process and Products

Main production equipment
DRI; EAF; Steel other/unspecified

Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)

1Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1 Electric arc furnace steelmaking capacity Other/unspecified steelmaking capacity Nominal crude steel capacity (total)
announced 304[6] 461[6] 765[6]

Table 5: Plant-level Crude Iron Production Capacities (thousand tonnes per annum)

1Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1 Sponge iron/DRI capacity Nominal iron capacity (total)
announced 994[6] 994[6]
operating 90[6] 90[6]

Table 6: Actual Plant-level Crude Steel Production by Year (thousand tonnes per annum)

Year Other/unknown steel production
2020 unknown
2021 unknown
2022 unknown
2023 unknown

Table 7: Actual Plant-level Crude Iron Production by Year (thousand tonnes per annum)

Year DRI production Other/unknown iron production
2019 unknown unknown
2020 unknown unknown
2021 unknown unknown
2022 unknown unknown
2023 unknown unknown

Unit Details

Table 8: Direct Reduced Iron Furnace Details

Unit name Status Announced date Furnace type Current capacity (ttpa) Reductant
unknown DRI (1) operating[6] 2010[6] rotary kiln[7] 30[6] coal[7]
unknown DRI (2) operating[6] 2010[6] rotary kiln[7] 30[6] coal[7]
unknown DRI (3) operating[6] 2010[6] rotary kiln[7] 30[6] coal[7]
unknown DRI (4) announced[6] 2010[6] rotary kiln[7] 145[6] coal[7]
unknown DRI (5) announced[6] 2010[6] rotary kiln[7] 145[6] coal[7]
unknown DRI (6) announced[6] 2010[6] rotary kiln[7] 145[6] coal[7]
unknown DRI (7) announced[6] 2010[6] rotary kiln[7] 145[6] coal[7]
unknown DRI (8) announced[6] 2010[6] rotary kiln[7] 207[6] coal[7]
unknown DRI (9) announced[6] 2010[6] rotary kiln[7] 207[6] coal[7]

Table 9: Electric Arc Furnace Details

Unit name Status Announced date Current capacity (ttpa) Current size (tonnes)
unknown EAF (1) announced[6] 2022[6] 304[6] 40.0[6]

Table 10: Electric Arc Furnace Feedstock Details

Unit name Scrap-based % scrap % DRI % granulated pig iron % other iron
unknown EAF (1) yes[6] >0[6] 70.00[6] >0[6] 30.00[6]

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.

References

  1. "Prakash At A Glance – Prakash Industries Limited". prakash.com. Retrieved 2024-01-12.
  2. InstaFinancials. "Prakash sponge iron and power private limited - U27101KA2007PTC043812". www.instafinancials.com. Retrieved 2024-01-12.
  3. Cite error: Invalid <ref> tag; no text was provided for refs named :0
  4. "Environmental Clearance" (PDF). MoEF&CC. 17 June, 2022. Retrieved 12 January 2024. {{cite web}}: Check date values in: |date= (help)CS1 maint: url-status (link)
  5. "Public hearing" (PDF). Karnataka State Pollution Control Board. Retrieved 2024-11-18.{{cite web}}: CS1 maint: url-status (link)
  6. 6.00 6.01 6.02 6.03 6.04 6.05 6.06 6.07 6.08 6.09 6.10 6.11 6.12 6.13 6.14 6.15 6.16 6.17 6.18 6.19 6.20 6.21 6.22 6.23 6.24 6.25 6.26 6.27 6.28 6.29 6.30 6.31 6.32 6.33 6.34 6.35 6.36 6.37 6.38 6.39 6.40 6.41 6.42 6.43 6.44 (PDF) https://web.archive.org/web/20240115051418/https://kspcb.karnataka.gov.in/sites/default/files/inline-files/Executive%20Summary_English_Prakash_%20Sponge_iron&powerPvt.Ltd_.pdf. Archived from the original (PDF) on 2024-01-15. {{cite web}}: Missing or empty |title= (help)
  7. 7.00 7.01 7.02 7.03 7.04 7.05 7.06 7.07 7.08 7.09 7.10 7.11 7.12 7.13 7.14 7.15 7.16 7.17 7.18 7.19 (PDF) https://web.archive.org/web/20240115070211/https://environmentclearance.nic.in/writereaddata/Online/TOR/18_Jun_2022_17285275730083121Covering.pdf. Archived from the original (PDF) on 2024-01-15. {{cite web}}: Missing or empty |title= (help)
  8. https://web.archive.org/web/20240905162757/https://prakash.com/portfolio/sponge-iron/. Archived from the original on 2024-09-05. {{cite web}}: Missing or empty |title= (help)

Resources