Puchezh-Yuryevets Gas Pipeline
From Global Energy Monitor
Part of the Global Gas Infrastructure Tracker, a Global Energy Monitor project. |
Related categories: |
Puchezh-Yuryevets Gas Pipeline (Russian: Газопровод-отвод Пучеж - ГРС «Юрьевец» Юрьевецкого района Ивановской области) is a proposed gas pipeline in Russia.[1]
Location
The pipeline is proposed to run from Puchezh gas distribution station, Puchezhsky District, Ivanovo Oblast to Yuryevets gas distribution station in Yuryevetsky District, Ivanovo Oblast, Russia.[1]
Project details
- Operator:
- Owner: Gazprom[1]
- Parent company: Gazprom
- Capacity: 0.61mill.Sm3/day[2]
- Length: 46.49 km[2]
- Diameter: 100 mm[3]
- Status: Proposed[1]
- Start year:
- Cost:
- Financing:
- Associated infrastructure:
Background
The pipeline was included in the gasification program of Gazprom for 2021-2025 for the Ivanovo region.[1] As of July 2023, the pipeline has not been commissioned yet.
Articles and resources
References
- ↑ 1.0 1.1 1.2 1.3 1.4 "Программа газификации 2021–2025 в Ивановской области". Gazprommap.ru. 2022. Retrieved Jul 19, 2022.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 2.0 2.1 "В Ивановской области построят газопровод-отвод и ГРС" (in русский). Retrieved 2022-08-05.
- ↑ "Об утверждении проекта планировки и проекта межевания территории для строительства газопровода-отвода к ГРС «Юрьевец» и ГРС «Юрьевец» Юрьевецкого района Ивановской области". pravo.gov.ru. Retrieved 2022-08-05.