Pyote facility
From Global Energy Monitor
The Pyote facility is a 300 megawatt (MW) Bitcoin mining project currently under construction near Pyote, Texas, in Ward County. It is owned by Genesis Digital Assets.
Part of the Cryptomining Tracker, a project by FracTracker & Global Energy Monitor. |
Related categories: |
Location
The map below shows the approximate location of the Pyote facility, United States. The exact location near Pyote is not known.
Background
The Pyote facility is one of two projects in the United States owned by Genesis Digital Assets; the other is located near Greenville, South Carolina.[1]
The Texas facility has a maximum infrastructure of 300 MWs.[2]
If operational at full capacity, it would be one of the largest cryptocurrency mining operations in the US. The company has announced plans to ultimately operate 1.4 GW of mining operations globally.[3]
Project Details
- Power usage (MW): 300 MW
- Owner: Genesis Digital Assets
- Parent:
- Location: near Pyote, Texas, USA
- Coordinates:
Articles and Resources
References
- ↑ "Data Centers," Genesis Digital Assets website, accessed June 6, 2022
- ↑ "Digital Assets Announces New 300 MW Industrial-Scale Bitcoin Mining Data Center in West Texas," Global Newswire, November 1, 2021
- ↑ "Bitcoin Mining Operation Genesis Digital Assets Announces New Data Center in West Texas," Bitcoin.com, June 8, 2022