This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor. |
Sub-articles: |
North Rumela-Al-Najaf Gas Pipeline,انبوب غاز شمال الرميلة- النجف, is an under construction gas pipeline in Iraq.[1]
Location
The pipeline is proposed to run from the northern Rumela oil fields in Basrah to Al-Najaf governorate in Iraq. [1]
Project details
- Owner: South Gas Company (51%), Shell (44%), and Mitsubishi Corporation (5%).[2]
- Parent company: Iraqi Ministry of Oil
- Capacity:
- Length: 350 kilometers
- Diameter:
- Status: Construction[1]
- Start year: 2019
- Cost:
- Financing:
- Associated infrastructure:
Articles and resources
References
- ↑ 1.0 1.1 1.2 1.3 "أنبوب غاز جديد لدعم قطاعي الطاقة والصناعة في مدن عراقية". اندبندنت عربية (in العربية). 2021-01-19. Retrieved 2022-07-26.
- ↑ 2.0 2.1 "Basrah Gas Company". www.shell.iq. Retrieved 2022-07-26.
*add as many countries as the pipeline passes through