RB Kolubara

From Global Energy Monitor

RB Kolubara is a Serbian coal mining and smelting company with headquarters in Lazarevac, Kolubara District, Serbia.[1] The mining company has coal reserves amounting to 2.2 billion tonnes of lignite, one of the largest lignite reserves in Europe, and it produces 22.6 million tonnes of coal per year.[1]

History

The full legal name of the company is Privredno društvo za proizvodnju, preradu i transport uglja Rudarski basen Kolubara d.o.o. Lazarevac or Company for the production, processing and transport of coal mine basin Kolubara Ltd. Lazarevac. The beginnings of mining in the region of Kolubara basin are associated with the year 1896 when the first pit Zvizdar was opened. In the eastern and western part of the basin coal has been successively extracted from the 14 pits Zvizdar, Sokolovac, Skobalj, Radljevo, Prkosava, Veliki Crljeni, Kolubara 1, Veliki Crljeni - Kolubara 2, Kosmaj - Kolubara 3, Baroševac, Šopić, Junkovac and others. A turning point in coal production came in 1952 with the opening of the first open pit (Fields A) which started mass surface mining of lignite. Opening of new mines and processing facilities fallowed.[2] The mining projects' original intention was to secure a stable, constant supply of energy and electricity for the country, which is why the Serbian federal government considers these projects of national interest.

Since Kolubara mining basin is the largest coal supplier for Elektroprivreda Srbije it plays a vital role in the country's energy independence. About 52% of the electricity in Serbia is produced based on the lignite from Kolubara,[3] that is about 20 billion kW hours of electricity per year. Most of the coal (about 90%) is used for electricity production in TPP Nikola Tesla power station in Obrenovac, in Kolubara in Veliki Crljeni and in Morava in Svilajnac.[4]

Environmental Improvement project

In 2011 Kolubara started the Environmental Improvement project in order to improve the mining conditions and effects on the environment as well as the local communities involved. The estimated cost of this project is approximately EUR 165.2; the initiative is financed by the European Bank of Reconstruction and Development EBRD (EUR 80 million ), the German state development bank KfW (EUR 75 million) and state electricity company Elektroprivreda Srbije (EUR 80 million).[5] According to information provided by EBRD, the investment will generate benefits resulting in an environmental improvement of the Kolubara complex. The main benefits being more efficient and cleaner extraction of natural resources, supplying the existing power plants with lignite of a uniform quality (that will lead to more stable and efficient operations and controlled uniform emissions which will result in lower levels of CO2 and other pollutants as well as reduced wear and tear and maintenance costs) and helping Serbia to achieve emission limits set by the recently introduced Industrial Emissions Directive.[6]

The Environmental Improvement project's goal is to also introduce new equipment, strategies and techniques to the workers and planners of Elektroprivreda Srbije (EPS). The purpose of introducing the new technologies and methods is to increase efficiency both economically speaking and environmentally speaking.[5]

Controversial issues

Social impact

For the last 10 years the Kolubara mine basin has been expanding towards the settlements causing conflicts between inhabitants and mines. This problem affects around 6000 families. During the last decade, Elektroprivreda Srbije has moved hundreds of households, two complete villages and partially 10 villages. One of the main villages impacted was Vreoci, which resides in central Serbia. The project required a new mine pit on the location of the Vreoci graveyard as well as the relocation of more than 1,000 households. Underneath the graveyard lies approximately 50 million tons of coal, a requirement to get to the 600 million tons of lignite which would help the project but damage the local community's burial grounds and cultural landmark.[7] Despite the heavy protests from the villagers, the EBRD loan was approved and the excavation of the graves continued. These protests have been met with police intervention and a series of blockades preventing the villages into the graveyard. The villagers asked for their houses to be relocated first so that shelter was secured, yet that process has not been as successful as promised.[8] The lack of progress in the resettlement phase of the project has caused villagers to live in sub-par conditions and in locations with high air and ground pollution. Further protests ensued, such as street protests and hunger strikes.

Resettlement caused by the Tamnava West expansion in 2003 was not done according to good standards either, the main reason being shortage of funds which led to slowing down of the land acquisition and development of the proposed infrastructure. In the end, they were never conducted, which diminished credibility of Elektroprivreda Srbije in the eyes of inhabitants. With continued expansion of the mine, the relocation of households became urgent and residents were under enormous pressure to accept financial compensation and leave the territory designated for coal excavation. The value of their property was often underestimated.[9]

Environmental Impact

In spite of the Environmental improvement project carried out in 2011, there are still various environmental consequences of the mining work in Kolubara complex such as gas releases (carbon monoxide, sulfur dioxide, ozone etc.), pollution of water supply and deterioration of the ground.[9]

2013 Landslide

In May 2013 the overburden of field B of the Kolubara lignite mine collapsed and caused a landslide that destroyed seven houses and one road in the town of Junkovac. On 28 March 2014 Serbian nongovernmental organization CEKOR (Centre for Ecology and Sustainable Development) pressed charges against Kolubara company for endangering public safety in Junkovac. The case was made after the statement by the Department for Mining Inspection in the Ministry of Natural Resources, Mining and Spatial planning that confirmed the Kolubara company has overloaded the dump field that caused the landslide.[10]

2014 Floods

Due to heavy floods which devastated the area in May 2014, there has been a week-long interruption in coal transport from Kolubara. Water two meters high covered all the machines and the railway on which the coal is being transported.[11] The Belgrade media have written about the damage and repayment of it since the machinery and equipment were not ensured against flooding.[12] Damage is estimated to be at least 100 million Euros.[13] The flood’s impacts were much worse for those living near the mine, especially where the waters and mud mixed with pollution from the mine.[14]

Corruption

In October 2011 authorities arrested 17 people, including two former directors of the Kolubara mine Dragan Tomic and Vladan Jovicic, eight executive managers and seven owners of private firms with which Kolubara conducted business. The executive managers are suspected of abusing their positions to illegally appropriate up to 2.9 million Euros, while enabling private companies to illegally profit 9.2 million Euros.[15]

In January 2013 Serbia's Energy Minister Zorana Mihajlović in her address, announced that Kolubara's business dealings are now a subject of an investigation, on suspicion of financial abuses. Allegations include paying high salaries to non-existent employees, buying over-priced equipment, and using resettlement compensation to pass bloated amounts of money to people close to the management.[16]

See also

References

  1. 1.0 1.1 "Mineral deposits of Serbia". docstoc.com. 2012. Archived from the original on 2015-02-13. Retrieved 2013-06-28.
  2. Rudarski basen Kolubara. Rudarstvo staro 117 godina. Retrieved 9. 6. 2014
  3. Rudarski basen Kolubara. Proizvodnja. Retrieved 11. 6. 2014
  4. Serbia Energy. Serbia mining:The importance of “Kolubara mine basin” in the Serbian energy system. Retrieved 11. 6. 2014
  5. 5.0 5.1 "EPS Kolubara Environmental Improvement". ebrd.com. Retrieved 2017-10-25.
  6. Information about the project on EBRD webpage. Template:Webarchive
  7. "Lessons Learned from the Kolubara 'environmental improvement' project" (PDF). bankwatch.org. Retrieved 2017-10-25.
  8. "Relocation of the Vreoci village, Kolubara coal basin, Serbia". ejatlas.org. Retrieved 2017-10-25.
  9. 9.0 9.1 CEKOR Complaint to the EBRD Project Complaint Mechanism submitted on 1. 10. 2013.
  10. Bankwatch. Serbian NGO presses criminal charges against Kolubara mining company over landslide. Retrieved 6. 6. 2014
  11. B92. Coal transport from Kolubara to Nikola Tesla power plant resumes. Retrieved 6. 6. 2014
  12. B92. RB Kolubara: Netačne izjave iz EPS. Retrieved 6. 6. 2014
  13. RTV. Šteta u "Kolubari" najmanje 100 miliona evra. Retrieved 6. 6. 2014
  14. Bankwatch. When water mixes with coal - The impacts of the floods in Serbia on people living next to lignite mines. Retrieved 6. 6. 2014
  15. Regional anti-corruption initiative. SERBIA: COAL MINE CORRUPTION TRIAL BEGINS. Retrieved 9. 6. 2014
  16. "Millions" syphoned off from coal mine, minister charges. Retrieved 9. 6. 2014

External links

Wikipedia also has an article on RB Kolubara ([1]). This article may use content from the Wikipedia article under the terms of the Creative Commons Attribution-ShareAlike 3.0 Unported License].