Racibórz-Oświęcim Gas Pipeline

From Global Energy Monitor
Part of the
Global Gas Infrastructure Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related categories:

Racibórz-Oświęcim Gas Pipeline a proposed gas pipeline in Poland.[1]

Location

The gas pipeline will be routed through the territories of the following municipalities: Racibórz, Kuźnia Raciborska, Nędza, Lyski, Rybnik, Czerwionka- Leszczyny, Orzesze, Suszec, Kobiór, Tychy, Bojszowy, Bieruń, Oświęcim and Chełmek.[1]

Loading map...

Project details

  • Operator: Gaz-System[1]
  • Owner: Gaz-System[1]
  • Parent: Gaz-System[1]
  • Length: 115 kilometers[1]
  • Diameter: 27.5 inches[1]
  • Status: Proposed
  • Start year: 2025
  • Cost:

Background

Pipeline construction was expected to begin in 2022, but appears to have been delayed. As of July, 2022, Gaz-System reports that the pipeline is currently in the "engineering design" phase, with the permitting phase yet to begin. Accordingly, their updated timeline notes that they expect the pipeline to be commissioned in 2025.[2]

Articles and resources

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 "Racibórz–Oświęcim Gas Pipeline". Gaz-System. Retrieved 2021-09-20.{{cite web}}: CS1 maint: url-status (link)
  2. www.gaz-system.pl https://www.gaz-system.pl/en/transmission-system/investment-projects/other-major-investment-projects/raciborz-oswiecim.html. Retrieved 2022-07-14. {{cite web}}: Missing or empty |title= (help)

Related GEM.wiki articles

External resources

External articles