Rajasthan nuclear power plant is an operating nuclear power plant in Rawatbhata Tehsil, Chittorgarh District, Rajasthan, India.

Project Details

Table 1: Unit-level project details for Rajasthan nuclear power plant

Unit name Status Commissioning year Nameplate capacity Reactor type Model Owner Operator
1 Mothballed[1] 1973[1] 100 MW[1] Pressurized heavy water reactor[1] Horizontal Pressure Tube type[1] Nuclear Power Corporation Of India LTD [100%][1] Nuclear Power Corporation Of India LTD[1]
2 Operating[2] 1981[2] 200 MW[2] Pressurized heavy water reactor[2] Horizontal Pressure Tube type[2] Nuclear Power Corporation Of India LTD [100%][2] Nuclear Power Corporation Of India LTD[2]
3 Operating[3] 2000[3] 220 MW[3] Pressurized heavy water reactor[3] Horizontal Pressure Tube type[3] Nuclear Power Corporation Of India LTD [100%][3] Nuclear Power Corporation Of India LTD[3]
4 Operating[4] 2000[4] 220 MW[4] Pressurized heavy water reactor[4] Horizontal Pressure Tube type[4] Nuclear Power Corporation Of India LTD [100%][4] Nuclear Power Corporation Of India LTD[4]
5 Operating[5] 2010[5] 220 MW[5] Pressurized heavy water reactor[5] Horizontal Pressure Tube type[5] Nuclear Power Corporation Of India LTD [100%][5] Nuclear Power Corporation Of India LTD[5]
6 Operating[6] 2010[6] 220 MW[6] Pressurized heavy water reactor[6] Horizontal Pressure Tube type[6] Nuclear Power Corporation Of India LTD [100%][6] Nuclear Power Corporation Of India LTD[6]
7 Construction[7] 700 MW[7] Pressurized heavy water reactor[7] Horizontal Pressure Tube type[7] Nuclear Power Corporation Of India LTD [100%][7] Nuclear Power Corporation Of India LTD[7]
8 Construction[8] 700 MW[8] Pressurized heavy water reactor[8] Horizontal Pressure Tube type[8] Nuclear Power Corporation Of India LTD [100%][8] Nuclear Power Corporation Of India LTD[8]

Table 2: Additional unit-level timeline details for Rajasthan nuclear power plant

Unit name Construction start First criticality (more info) First grid connection Commercial operation
1 August 1, 1965[1] August 11, 1972[1] November 30, 1972[1] December 16, 1973[1]
2 April 1, 1968[2] October 8, 1980[2] November 1, 1980[2] April 1, 1981[2]
3 February 1, 1990[3] December 24, 1999[3] March 10, 2000[3] June 1, 2000[3]
4 October 1, 1990[4] November 3, 2000[4] November 17, 2000[4] December 23, 2000[4]
5 September 18, 2002[5] November 24, 2009[5] December 22, 2009[5] February 4, 2010[5]
6 January 20, 2003[6] January 23, 2010[6] March 28, 2010[6] March 31, 2010[6]
7 July 18, 2011[7]
8 September 30, 2011[8]

Table 3: Additional unit-level capacity details for Rajasthan nuclear power plant

(Read more about nuclear capacity definitions.)

Unit name Reference net capacity Design net capacity Thermal capacity
1 90 MW[1] 207 MW[1] 346 MWt[1]
2 187 MW[2] 207 MW[2] 693 MWt[2]
3 202 MW[3] 202 MW[3] 801 MWt[3]
4 202 MW[4] 202 MW[4] 801 MWt[4]
5 202 MW[5] 202 MW[5] 801 MWt[5]
6 202 MW[6] 202 MW[6] 801 MWt[6]
7 630 MW[7] 630 MW[7] 2177 MWt[7]
8 630 MW[8] 630 MW[8] 2177 MWt[8]

Location

Table 4: Unit-level location details for Rajasthan nuclear power plant

Unit name Location Coordinates (WGS 84)
1 Rawatbhata Tehsil, Chittorgarh District, Rajasthan, India[9] 24.8747, 75.6189 (exact)
2 Rawatbhata Tehsil, Chittorgarh District, Rajasthan, India[9] 24.8747, 75.6189 (exact)
3 Rawatbhata Tehsil, Chittorgarh District, Rajasthan, India[9] 24.8747, 75.6189 (exact)
4 Rawatbhata Tehsil, Chittorgarh District, Rajasthan, India[9] 24.8747, 75.6189 (exact)
5 Rawatbhata Tehsil, Chittorgarh District, Rajasthan, India[9] 24.8747, 75.6189 (exact)
6 Rawatbhata Tehsil, Chittorgarh District, Rajasthan, India[9] 24.8747, 75.6189 (exact)
7 Rawatbhata Tehsil, Chittorgarh District, Rajasthan, India[9] 24.8747, 75.6189 (exact)
8 Rawatbhata Tehsil, Chittorgarh District, Rajasthan, India[9] 24.8747, 75.6189 (exact)

The map below shows the exact location of the nuclear power plant:

Loading map...

Background

Unit 1 of the Rajasthan Nuclear Power Plant has been in a state of shutdown since October 9th, 2004[1]. The reactor has been entirely defueled and is currently undergoing maintenance within a dry preservation environment[10][11].

Articles and Resources

Additional data

To access additional data, including an interactive map of global nuclear power plants, a downloadable dataset, and summary data, please visit the Global Nuclear Power Tracker on the Global Energy Monitor website.

References

  1. 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 1.14 https://web.archive.org/web/20221005193152/http://pris.iaea.org/pris/CountryStatistics/ReactorDetails.aspx?current=302. Archived from the original on 05 October 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  2. 2.00 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.10 2.11 2.12 2.13 https://web.archive.org/web/20220522161600/https://pris.iaea.org/PRIS/CountryStatistics/ReactorDetails.aspx?current=303. Archived from the original on 22 May 2022. {{cite web}}: Missing or empty |title= (help)
  3. 3.00 3.01 3.02 3.03 3.04 3.05 3.06 3.07 3.08 3.09 3.10 3.11 3.12 3.13 https://web.archive.org/web/20220522172457/https://pris.iaea.org/PRIS/CountryStatistics/ReactorDetails.aspx?current=287. Archived from the original on 22 May 2022. {{cite web}}: Missing or empty |title= (help)
  4. 4.00 4.01 4.02 4.03 4.04 4.05 4.06 4.07 4.08 4.09 4.10 4.11 4.12 4.13 https://web.archive.org/web/20220522175743/https://pris.iaea.org/PRIS/CountryStatistics/ReactorDetails.aspx?current=288. Archived from the original on 22 May 2022. {{cite web}}: Missing or empty |title= (help)
  5. 5.00 5.01 5.02 5.03 5.04 5.05 5.06 5.07 5.08 5.09 5.10 5.11 5.12 5.13 https://web.archive.org/web/20220522164547/https://pris.iaea.org/PRIS/CountryStatistics/ReactorDetails.aspx?current=295. Archived from the original on 22 May 2022. {{cite web}}: Missing or empty |title= (help)
  6. 6.00 6.01 6.02 6.03 6.04 6.05 6.06 6.07 6.08 6.09 6.10 6.11 6.12 6.13 https://web.archive.org/web/20220522175013/https://pris.iaea.org/PRIS/CountryStatistics/ReactorDetails.aspx?current=297. Archived from the original on 22 May 2022. {{cite web}}: Missing or empty |title= (help)
  7. 7.0 7.1 7.2 7.3 7.4 7.5 7.6 7.7 7.8 7.9 https://web.archive.org/web/20220522161649/https://pris.iaea.org/PRIS/CountryStatistics/ReactorDetails.aspx?current=298. Archived from the original on 22 May 2022. {{cite web}}: Missing or empty |title= (help)
  8. 8.0 8.1 8.2 8.3 8.4 8.5 8.6 8.7 8.8 8.9 https://web.archive.org/web/20220522165034/https://pris.iaea.org/PRIS/CountryStatistics/ReactorDetails.aspx?current=299. Archived from the original on 22 May 2022. {{cite web}}: Missing or empty |title= (help)
  9. 9.0 9.1 9.2 9.3 9.4 9.5 9.6 9.7 https://goo.gl/maps/Gy2Gtb8kFkwkVksY8. {{cite web}}: Missing or empty |title= (help)
  10. "Home:Nuclear Power Corporation of India Limited".{{cite web}}: CS1 maint: url-status (link)
  11. "RAPS-1 reactor not decommissioned". The Hindu. 2011-02-21. ISSN 0971-751X. Retrieved 2024-05-20.