Rajjaprabha Dam solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Other names: Rajjaprabha Dam 1 Floating Solar PV Farm (Phase 1), Rajjaprabha Dam Solar PV Park, Rajjaprabha Dam 2 Floating Solar PV Farm (Phase 2)
Rajjaprabha Dam solar farm (เขื่อนรัชชประภา) is a solar photovoltaic (PV) farm in pre-construction in Surat Thani Province, Thailand.
Project Details
Table 1: Phase-level project details for Rajjaprabha Dam solar farm
Phase name | Status | Commissioning year | Nameplate capacity | Technology | Owner |
---|---|---|---|---|---|
1 | Pre-construction[1] | 2034 (planned)[1] | 140 MW[1] | PV[1] | Electricity Generating Authority of Thailand (EGAT) [100%][1] |
2 | Pre-construction[1] | 2036 (planned)[1] | 100 MW[1] | PV[1] | Electricity Generating Authority of Thailand (EGAT) [100%][1] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Rajjaprabha Dam solar farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Surat Thani Province, Thailand[1] | 8.975, 98.8046 (approximate)[1] |
2 | Surat Thani Province, Thailand[1] | 8.975, 98.8046 (approximate)[1] |
The map below shows the approximate locations of the solar farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 (PDF) https://web.archive.org/web/20240201142628/https://www.egat.co.th/home/wp-content/uploads/2022/09/EGAT-Carbon-Neutrality-20220909.pdf. Archived from the original (PDF) on 01 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help)