Ramadi solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Other names: Sama Ramadi solar station (Phase 1)

Ramadi solar farm (محطة الرمادي للطاقة الشمسية ٢, محطة الرمادي للطاقة الشمسية ١) is a solar photovoltaic (PV) farm under construction in Ramadi, Anbar Governorate, Iraq.

Project Details

Table 1: Phase-level project details for Ramadi solar farm

Phase name Status Commissioning year Nameplate capacity Technology Owner Operator
1 Construction[1][2][3][4] 2024 (planned)[5] 100 MW[6] PV[7] Masdar Clean Energy [100%] (مصدر)[1] Masdar Clean Energy (مصدر)[1]
2 Construction[8][2][3][4] 2024 (planned)[5] 250 MW[8] PV[7] Masdar Clean Energy [100%] (مصدر)[8] Masdar Clean Energy (مصدر)[8]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Ramadi solar farm

Phase Name Location Coordinates (WGS 84)
1 Ramadi, Anbar Governorate, Iraq[9] 33.4206, 43.3078 (approximate)[9]
2 Ramadi, Anbar Governorate, Iraq[9] 33.4206, 43.3078 (approximate)[9]

The map below shows the approximate locations of the solar farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 https://web.archive.org/web/20240207145417/https://www.energylivenews.com/2021/10/20/masdar-to-develop-five-solar-energy-projects-in-iraq/. Archived from the original on 07 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  2. 2.0 2.1 https://web.archive.org/web/20240207145627/https://non14.net/public/153036. Archived from the original on 07 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  3. 3.0 3.1 https://web.archive.org/web/20240207145750/https://www.ina.iq/177344--.html. Archived from the original on 07 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  4. 4.0 4.1 https://web.archive.org/web/20240207145247/https://www.arabrena.com/3404/. Archived from the original on 07 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  5. 5.0 5.1 https://web.archive.org/web/20240207145223/https://almaalomah.me/news/local/%D8%A7%D9%84%D8%B9%D8%B1%D8%A7%D9%82-%D9%8A%D8%B3%D8%AA%D8%B9%D8%AF-%D9%84%D8%A5%D8%AF%D8%AE%D8%A7%D9%84-%D8%A3%D8%B1%D8%A8%D8%B9-%D9%85%D8%AD%D8%B7%D8%A7%D8%AA-%D8%B4%D9%85%D8%B3%D9%8A%D8%A9-%D9%84%D9%84%D8%AE%D8%AF%D9%85%D8%A9-%D9%82%D8%B1%D9%8A%D8%A8%D8%A7. Archived from the original on 07 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  6. https://web.archive.org/web/20240201114009/https://www.dinarupdates.com/showthread.php?55202-Electricity-contracts-two-contracts-for-the-installation-of-six-solar-stations. Archived from the original on 01 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  7. 7.0 7.1 https://web.archive.org/web/20220325211656/https://news.masdar.ae/en/news/2021/06/25/06/22/masdar-signs-strategic-agreement-to-develop-solar-projects-in-republic-of-iraq. Archived from the original on 25 March 2022. {{cite web}}: Missing or empty |title= (help)
  8. 8.0 8.1 8.2 8.3 https://web.archive.org/web/20240201113712/https://energy-utilities.com/masdar-signs-agreement-to-implement-1gw-of-solar-news114605.html. Archived from the original on 01 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  9. 9.0 9.1 9.2 9.3 https://web.archive.org/web/20240206221232/https://latitude.to/map/iq/iraq/cities/ramadi. Archived from the original on 06 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)