Rashidpur-Habigonj Gas Pipeline

From Global Energy Monitor
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor.
Sub-articles:

Rashidpur-Habigonj Gas Pipeline is an operating natural gas pipeline in Bangladesh.[1]

Location

The pipeline runs from Rashidpur, Bangladesh to Habiganj, Bangladesh.

Loading map...

Project Details

  • Operator: Gas Transmission Company Limited (GTCL)[2][3]
  • Owner: Gas Transmission Company Limited (GTCL)[2][3]
  • Parent company: Petrobangla[2][3]
  • Capacity: 500 million cubic feet per day[2][3]
  • Length: 17.4 mi / 28 km[2][3]
  • Diameter: 30 inches[2][3]
  • Status: Operating[3]
  • Start year: 2005[4]
  • Cost:
  • Financing:
  • Associated infrastructure:

Background

The pipeline is operated by GTCL, a subsidiary of Petrobangla.[1] It is part of the Rashidpur-Ashuganj Gas Transmission Pipeline, which also includes the Ashuganj-Habiganj Loopline.[3]

Articles and resources

References

  1. 1.0 1.1 Existing Pipelines, GTCL, accessed February 2020
  2. 2.0 2.1 2.2 2.3 2.4 2.5 "Annual Report 2020" (PDF). Petrobangla.{{cite web}}: CS1 maint: url-status (link)
  3. 3.0 3.1 3.2 3.3 3.4 3.5 3.6 3.7 "Annual Report 2021" (PDF). Petrobangla.{{cite web}}: CS1 maint: url-status (link)
  4. https://gtcl.org.bd/site/page/6dfb2eb9-3070-4ab2-b2ad-8ed546a933c1/-

Related GEM.wiki articles

Existing Oil and Gas Pipelines in Bangladesh

External resources

External articles