Rashidpur-Habigonj Gas Pipeline
From Global Energy Monitor
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Rashidpur-Habigonj Gas Pipeline is an operating natural gas pipeline in Bangladesh.[1]
Location
The pipeline runs from Rashidpur, Bangladesh to Habiganj, Bangladesh.
Project Details
- Operator: Gas Transmission Company Limited (GTCL)[2][3]
- Owner: Gas Transmission Company Limited (GTCL)[2][3]
- Parent company: Petrobangla[2][3]
- Capacity: 500 million cubic feet per day[2][3]
- Length: 17.4 mi / 28 km[2][3]
- Diameter: 30 inches[2][3]
- Status: Operating[3]
- Start year: 2005[4]
- Cost:
- Financing:
- Associated infrastructure:
Background
The pipeline is operated by GTCL, a subsidiary of Petrobangla.[1] It is part of the Rashidpur-Ashuganj Gas Transmission Pipeline, which also includes the Ashuganj-Habiganj Loopline.[3]
Articles and resources
References
- ↑ 1.0 1.1 Existing Pipelines, GTCL, accessed February 2020
- ↑ 2.0 2.1 2.2 2.3 2.4 2.5 "Annual Report 2020" (PDF). Petrobangla.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 3.0 3.1 3.2 3.3 3.4 3.5 3.6 3.7 "Annual Report 2021" (PDF). Petrobangla.
{{cite web}}
: CS1 maint: url-status (link) - ↑ https://gtcl.org.bd/site/page/6dfb2eb9-3070-4ab2-b2ad-8ed546a933c1/-
Related GEM.wiki articles
Existing Oil and Gas Pipelines in Bangladesh