Rasht-Chelavend Gas Pipeline

From Global Energy Monitor
Part of the
Global Gas Infrastructure Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related categories:

Rasht-Chelavend is an under construction gas pipeline to run from Iran to Azerbaijan.[1]

Location

The pipeline will run from Iran to Azerbaijan.[1]

Project details

  • Operator:
  • Owner:
  • Parent company:
  • Capacity: 5.5 bcm/year[2]
  • Length: 150 km[1]
  • Diameter: 42 in[1]
  • Status: Construction[2]
  • Start year:
  • Cost:
  • Financing:
  • Associated infrastructure: Sarakhs-Neka-Rasht Gas Pipeline[2]

Background

In February 2023, a representative of the Ministry of Oil of Iran mentioned that the pipeline would be completed within 2-3 months.[2] As of September 2024, there have not been any recent updates.

Articles and resources

References

  1. 1.0 1.1 1.2 1.3 https://eurasianet.org/turkmenistan-iran-azerbaijan-gas-swaps-surge. {{cite web}}: Missing or empty |title= (help)CS1 maint: url-status (link)
  2. 2.0 2.1 2.2 2.3 "Remaining section of Rasht-Chelavend gas pipeline will be completed in 2-3 months. It will add 5.5 bcm to gas transportation capacity between Iran and Azerbaijan". www.newscentralasia.net. February 16, 2024. Retrieved September 20, 2024.{{cite web}}: CS1 maint: url-status (link)