Rasht-Chelavend Gas Pipeline
From Global Energy Monitor
Part of the Global Gas Infrastructure Tracker, a Global Energy Monitor project. |
Related categories: |
Rasht-Chelavend is an under construction gas pipeline to run from Iran to Azerbaijan.[1]
Location
The pipeline will run from Iran to Azerbaijan.[1]
Project details
- Operator:
- Owner:
- Parent company:
- Capacity: 5.5 bcm/year[2]
- Length: 150 km[1]
- Diameter: 42 in[1]
- Status: Construction[2]
- Start year:
- Cost:
- Financing:
- Associated infrastructure: Sarakhs-Neka-Rasht Gas Pipeline[2]
Background
In February 2023, a representative of the Ministry of Oil of Iran mentioned that the pipeline would be completed within 2-3 months.[2] As of September 2024, there have not been any recent updates.
Articles and resources
References
- ↑ 1.0 1.1 1.2 1.3 https://eurasianet.org/turkmenistan-iran-azerbaijan-gas-swaps-surge.
{{cite web}}
: Missing or empty|title=
(help)CS1 maint: url-status (link) - ↑ 2.0 2.1 2.2 2.3 "Remaining section of Rasht-Chelavend gas pipeline will be completed in 2-3 months. It will add 5.5 bcm to gas transportation capacity between Iran and Azerbaijan". www.newscentralasia.net. February 16, 2024. Retrieved September 20, 2024.
{{cite web}}
: CS1 maint: url-status (link)