Rawson wind farm
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Rawson wind farm (Parque Eólico Rawson) is an operating wind farm in Rawson, Departamento Rawson, Chubut Province, Argentina.
Project Details
Table 1: Phase-level project details for Rawson wind farm
Phase name | Status | Commissioning year | Nameplate capacity | Type | Owner | Operator |
---|---|---|---|---|---|---|
1 | Operating[1] | 2012[2] | 52 MW[1] | Onshore[3] | Genneia SA [100%][2] | Genneia[2] |
2 | Operating[1] | 2012[2] | 31 MW[1] | Onshore[3] | Genneia SA [100%][2] | Genneia[2] |
3 | Operating[1] | 2017[2] | 25 MW[1] | Onshore[3] | Genneia SA [100%][2] | Genneia[2] |
Location
Table 2: Phase-level location details for Rawson wind farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Rawson, Departamento Rawson, Chubut Province, Argentina[4] | -43.3514, -65.188 (exact)[4] |
2 | Rawson, Departamento Rawson, Chubut Province, Argentina[5] | -43.3514, -65.188 (exact)[5] |
3 | Rawson, Chubut Province, Argentina[6] | -43.3514, -65.188 (approximate)[6] |
The map below shows the locations of the wind farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 https://web.archive.org/web/20240125161304/https://cammesaweb.cammesa.com/download/informe-mensual-de-generacion-renovable-variable-abril-2020-cammesa/?wpdmdl=35962&refresh=60f0749d10e131626371229. Archived from the original on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 https://web.archive.org/web/20240126154357/https://www.genneia.com.ar/parqueinterior.php?parque=1-parque-e%C3%B3lico-rawson. Archived from the original on 26 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 3.2 https://web.archive.org/web/20240126075412/https://www.argentina.gob.ar/noticias/basualdo-recorrio-en-chubut-el-parque-eolico-rawson. Archived from the original on 26 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 https://web.archive.org/web/20240131174617/https://www.thewindpower.net/windfarm_en_16169.php. Archived from the original on 31 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 https://web.archive.org/web/20240131174518/https://www.thewindpower.net/windfarm_en_16170.php. Archived from the original on 31 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 6.0 6.1 https://web.archive.org/web/20240131174615/https://www.thewindpower.net/windfarm_en_25281.php. Archived from the original on 31 January 2024.
{{cite web}}
: Missing or empty|title=
(help)