Razlog-Bansko Gas Pipeline

From Global Energy Monitor
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor.
Sub-articles:

The Razlog-Bansko Gas Pipeline is a proposed natural gas pipeline in Bulgaria.[1]

Location

The proposed pipeline route runs along the northern slopes of the Pirin Mountains, along the southern slopes of the Rila Mountains, and to AGRS Razlog-Bansko.[1]

Loading map...

Project Details

  • Owner: Bulgartransgaz
  • Proposed capacity: 0.26 billion cubic meters per year[1]
  • Length: 37 km / 23 miles[2]
  • Diameter: 250 mm / 10 inches[2]
  • Cost: €15.902 million (US$181.28 million)[2]
  • Financing: A €195,500 grant from the Kozloduy International Decommissioning Support Fund; €14.767 million equity investment from Bulgartransgaz; additional €940,000 investment[2]
  • Status: Proposed
  • Start Year: 2025[2]

Background

In 2017, Bulgartransgaz launched an environmental impact assessment (EIA) procedure for a pipeline to supply Razlog and Bansko with gas. Two routes were proposed, one that is 34 km and another that is 39 km.[3]

According to the Bulgartransgaz 2021-2030 Ten Year Network Development Plan, "The project is funded by a grant under Kozloduy International Decommissioning Fund to the amount of EUR 195.5 thousand. Co-funding by Bulgartransgaz EAD is to the amount of EUR 14.767 million."[2]

As of March 2021, Bulgartransgaz lists the pipeline as one of its "Projects in progress." The "planned deadline for completion of the project" is 2023.[2]

Bulgartransgaz's 2022-2031 TYNDP states that the project is expected to start construction in 2022-23, with an expected commissioning date between 2024 and 2025.[4]

Articles and resources

References

  1. 1.0 1.1 1.2 2020-2029 TEN-YEAR NETWORK DEVELOPMENT PLAN OF BULGARTRANSGAZ EAD, Bulgartransgaz, March 2020
  2. 2.0 2.1 2.2 2.3 2.4 2.5 2.6 BULGARTRANSGAZ EAD (March 2021). "2021-2030 TEN-YEAR NETWORK DEVELOPMENT PLAN OF BULGARTRANSGAZ EAD" (PDF). bulgartransgaz.bg. Retrieved August 10, 2021.{{cite web}}: CS1 maint: url-status (link)
  3. "News - Bulgartransgaz Launched EIA Procedure for Gas Pipeline to Razlog and Bansko". www.publics.bg. Retrieved 2021-08-12.
  4. "2022-2031 TEN-YEAR NETWORK DEVELOPMENT PLAN OF BULGARTRANSGAZ EAD" (PDF). Bulgartransgaz. Apr, 2022. Retrieved Jul 12th, 2022. {{cite web}}: Check date values in: |access-date= and |date= (help); line feed character in |title= at position 19 (help)CS1 maint: url-status (link)