Rehar Coal Mine
This article is part of the Global Coal Mine Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Related-articles: |
Rehar Coal Mine is an operating coal mine in Getra, Surguja, Chhattisgarh, India.
Location
Table 1: Project-level location details
Mine Name | Location | Coordinates (WGS 84) |
---|---|---|
Rehar Coal Mine | Getra, Surguja, Chhattisgarh, India | 23.101101, 82.927943 (exact) |
The map below shows the exact location of the coal mine:
Project Details
Table 2: Project status
Status | Status Detail | Opening Year | Closing Year |
---|---|---|---|
Operating[1] | – | 1999[1] | – |
Table 3: Operation details
Capacity (Mtpa) | Production (Mtpa) | Year of Production | Mine Type | Mining Method | Mine Size (km2) | Mine Depth (m) | Workforce Size |
---|---|---|---|---|---|---|---|
0[1] | 0.074[1] | 2022[1] | Underground | – | 4.25[1] | 300* | 836* |
Table 4: Coal resources and destination
Total Reserves (Mt) | Year of Total Reserves Recorded | Total Resources (Mt) | Coalfield | Coal Type | Coal Grade | Primary Consumer/ Destination |
---|---|---|---|---|---|---|
7.355[1] | 2023[1] | 14.13 | Lakhanpur | Subbituminous | Thermal | – |
Table 5: Ownership and parent company
Owner | Parent Company | Headquarters |
---|---|---|
South Eastern Coalfields Ltd | Coal India Ltd [100.0%] | India |
Note: The above section was automatically generated and is based on data from the Global Coal Mine Tracker April 2024 release and the September supplement.
Background on Mine
The Rehar Underground Coal Mine has a designed capacity of 0.31 MTPA on a mining lease area of 408.20 ha. It is in the Bisrampur coal block operated by South Eastern Coalfields Limited. The project received environment clearance on 27 November 2002.[2] However, the project needs revalidation of its environment clearance as per the revised guidelines of the MoEF&CC, India.[3]
The Rehar coal block is divided in two blocks, Rehar East known as Rehar UG mine and Rehar West (Mani & Jogi) known as Gayatri coal mine.
An expansion of the project from 0.31 MTPA to 0.80 MTPA was planned and ToR was accordingly obtained from the MoEF&CC India on 24 August 2009[4] and accordingly a EIA report was prepared as well.[5] However, due to technical reasons it was never completed.
Expansion Details
- Status: Cancelled
- Size of Expansion: 0.80 MTPA
- Year: 2009
- Permits and Applications: ToR for expansion of the Rehar UG mine, MoEF&CC India, 24 August 2009.
Articles and Resources
Additional data
To access additional data, including an interactive map of world coal mines, a downloadable dataset, and summary data, please visit the Global Coal Mine Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 (PDF) https://web.archive.org/web/20240718171430/https://www.secl-cil.in/writereaddata/FINAL_BISHRAMPUR%2520AREA_REHAR%2520UG%2520MINE_EAS22.pdf. Archived from the original (PDF) on 18 July 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ EC for Rehar underground coal mine project, MoEF&CC India, 27 November 2002
- ↑ Minutes of 38th EAC meeting, MoEF&CC India, 27 September 2018
- ↑ ToR for expansion of the Rehar UG mine, MoEF&CC India, 24 August 2009
- ↑ EIA summary for the Public hearing of the exapansion of the Rehar UG mine, SECL