Revuboe Coal Mine
This article is part of the Global Coal Mine Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Related-articles: |
Revuboe Coal Mine is a proposed coal mine in Tete, Mozambique.
Location
Table 1: Project-level location details
Mine Name | Location | Coordinates (WGS 84) |
---|---|---|
Revuboe Coal Mine | Tete, Mozambique | -16.234739, 33.831034 (approximate) |
The map below shows the approximate location of the coal mine:
Project Details
Table 2: Project status
Status | Status Detail | Project Type | Opening Year | Closing Year |
---|---|---|---|---|
Proposed | Pre-Permit | New | – | – |
Table 3: Operation details
Capacity (Mtpa) | Production (Mtpa) | Year of Production | Mine Type | Mining Method | Mine Size (km2) | Mine Depth (m) | Workforce Size |
---|---|---|---|---|---|---|---|
7[1] | – | – | Surface | Open Pit | 39.64 | 60* | * |
Table 4: Coal resources and destination
Total Reserves (Mt) | Year of Total Reserves Recorded | Total Resources (Mt) | Coalfield | Coal Type | Coal Grade | Primary Consumer/ Destination |
---|---|---|---|---|---|---|
519 | – | 1580 | – | Bituminous | Thermal & Met | – |
Table 5: Ownership and parent company
Owner | Parent Company | Headquarters |
---|---|---|
Minas de Revuboè Limitada | Talbot Group Investments Pty Ltd [58.9%]; Nippon Steel Corp [33.3%]; POSCO Australia Pty Ltd [7.8%] | USA, Japan, South Korea |
Note: The above section was automatically generated and is based on data from the Global Coal Mine Tracker April 2024 release and the September supplement.
Background
Revuboè Mine (Minas de Revuboè) is a proposed coal mine, owned by Talbot Group and Nippon Steel/Sumitomo Metal, to produce approximately 7 million tonnes per annum, in the Moatize Basin, Tete Province, Mozambique.[2] According to the company website, "In July 2004, Prospecting and Exploration Licence 693L was granted and renewed in 2009 for another 3 years. In April 2013, Mining Concession 4064C was granted and a mining contract was signed with the Government of Mozambique." While there have been few recent updates, the project appears to be moving forward, with public profiles available for site managers and other professionals.[2]
A promotional video on the company website estimates a 35-year life of mine.[2]
At the Coal Trans Conference in 2019, the mine was originally scheduled to produce 17 million tonnes per annum,[3] but in a 2021 update from IEA, the figure was reduced to 7 million tonnes per annum.[4]
Project Planning Delay
In May 2024, JSW Steel Limited, India’s largest steelmaker, announced its plan to acquire a 92% stake in Minas de Revuboè (MdR).[5] However, prior to the completion of this transaction, the Mozambican government revoked MdR’s mining lease. In August 2024, the Ministry of Mineral Resources and Energy issued a public notice indicating the potential reassignment of the concession to Stonecoal SA, a company whose directors are predominantly employees of Jindal Steel & Power Ltd. IN response, MdR initiated legal proceedings against the Mozambican government, seeking reinstatement of its mining rights. The dispute has been escalated to the International Centre for Settlement of Investment Disputes (ICSID) in Geneva, with proceedings commencing in September 2024.[5]
As of the updating of this wiki in February 2025, this complex legal dispute continues to delay the progress of the MdR project.
Articles and Resources
Additional data
To access additional data, including an interactive map of world coal mines, a downloadable dataset, and summary data, please visit the Global Coal Mine Tracker on the Global Energy Monitor website.
References
- ↑ (PDF) https://web.archive.org/web/20240302081348/https://rue.bmz.de/resource/blob/157250/2023-06-20-nextra-core-final-report-finalversion.pdf. Archived from the original (PDF) on 02 March 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 Revuboè Coal Mine, Tete Mining Technology, accessed November 2019.
- ↑ Barry Baxter, Mozambiques Coal Revival, World Coal, CoalTrans Conference, August 14, 2019
- ↑ IEA,Coal 2021 Analysis and Forecast, accessed Jan 2022
- ↑ 5.0 5.1 "JSW Steel’s Mozambique Coal Deal Stalls Following Legal Dispute Over Mining Rights", The Southern African Times, January 8, 2025.