Rio Seco wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Other names: Tunas wind farm

Rio Seco wind farm (Parque Eólico Rio Seco) is a wind farm under construction in Banes, Rio Seco, Holguín, Cuba.

Project Details

Table 1: Phase-level project details for Rio Seco wind farm

Phase name Status Commissioning year Nameplate capacity Type Owner Operator
1 Construction[1] 2024 (planned)[2] 50 MW[3] Onshore[4] Empresa Desarrolladora de Inversiones para Fuentes Renovables de Ener­gía [100%][5] Empresa Desarrolladora de Inversiones para Fuentes Renovables de Ener­gía[5]
2 Shelved (inferred June 2023) 96 MW[3] Onshore[3]

Location

Table 2: Phase-level location details for Rio Seco wind farm

Phase Name Location Coordinates (WGS 84)
1 Banes, Rio Seco, Holguín, Cuba[3] 21.1153, -75.7618 (approximate)[3]
2 Holguín, Cuba[3] 21.0789, -75.6886 (approximate)[3]

The map below shows the approximate locations of the wind farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. https://web.archive.org/web/20240126122123/http://www.ahora.cu/en/cuba-en/9067-cuba-opens-clean-energy-to-foreign-investment. Archived from the original on 26 January 2024. {{cite web}}: Missing or empty |title= (help)
  2. https://web.archive.org/web/20240126155629/https://www.power-technology.com/marketdata/power-plant-profile-rio-seco-1-wind-farm-cuba/. Archived from the original on 26 January 2024. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 3.3 3.4 3.5 3.6 https://web.archive.org/web/20240125171830/https://www.minem.gob.cu/es/actividades/energias-renovables-y-eficiencia-energetica. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  4. https://web.archive.org/web/20240125171922/http://periodico26.cu/index.php/en/special-reports-2/3303-la-herradura-wind-farm-advances. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 https://web.archive.org/web/20240131000113/https://www.cubaenergia.cu/publicaciones/renovable-cu/396-63-renovable-cu-marzo-2020-tema-resuktados-2019/file. Archived from the original on 31 January 2024. {{cite web}}: Missing or empty |title= (help)