Rogatec-Cersak Gas Pipeline
From Global Energy Monitor
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Rogatec-Cersak Gas Pipeline is an operating gas pipeline running from Slovenia to Italy.[1]
Location
The pipeline starts in Rogatec, Slovenia, and runs to Cersak, Italy.[2]
Project Details
- Operator: Plinovodi d.o.o
- Owner: Plinovodi d.o.o
- Parent company: Plinovodi d.o.o[3]
- Capacity: 147 GWh/day[4]
- Length:
- Diameter:
- Status: Operating[1]
- Start Year:
- Corresponding SciGrid name(s):
Background
These pipelines form the backbone of Slovenia's gas transmission system. The Rogatec-Gorizia segment is referred to as the "M2" pipeline, while the Gorizia-Vodice segment is known as the "M3".
Resources and articles
References
- ↑ 1.0 1.1 Diettrich, J.C.; Pluta, A.; Medrjoubi, W. (July 23, 2020). "The combined IGG gas transmission network data set". SciGRID_gas. Retrieved September 2, 2020.
{{cite web}}
: CS1 maint: url-status (link) - ↑ European Network of Transmission System Operators for Gas (October 2020). "TYNDP 2020 - MAP – Transmission" (PDF). ENTSOG. Retrieved December 4, 2020.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Operation of transmission system | Plinovodi d.o.o." www.plinovodi.si. Retrieved 2022-09-22.
- ↑ Plinovodi (October, 2021). "TEN-YEAR GAS TRANSMISSION NETWORK DEVELOPMENT PLAN FOR THE 2022 – 2031 PERIOD" (PDF). Plinovodi. Retrieved Sep 22nd, 2022.
{{cite web}}
: Check date values in:|access-date=
and|date=
(help); line feed character in|title=