Rostov-Maykop Gas Pipeline
From Global Energy Monitor
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Rostov-Maykop Gas Pipeline (Russian: Газопровод Ростов - Майкоп) is an operating gas pipeline in Russia.[1]
Location
The pipeline starts in the Rodionovo-Nesvetaysky District, Yaroslavl Oblast, Russia, and runs to the Maykopsky District, Republic of Adygea, Russia.[1]
Project Details
Rostov-Maykop I Gas Pipeline
- Operator: Gazprom[1]
- Owner: Gazprom[1]
- Parent company: Gazprom
- Capacity: 3.10 bcm/year[1][2]
- Length:
- Diameter: 820 mm[1][2], 1020[3]
- Status: Operating[1]
- Start year:
- Cost:
- Financing:
- Associated infrastructure: Maykop-Nevinnomyssk Gas Pipeline, Maykop-Samur-Sochi Gas Pipeline
Rostov-Maykop II Gas Pipeline
- Operator: Gazprom[1]
- Owner: Gazprom[1]
- Parent company: Gazprom
- Capacity: 4.10 bcm/year[4]
- Length:
- Diameter: 820 mm[1][2], 1020[3]
- Status: Operating[1]
- Start year:
- Cost:
- Financing:
- Associated infrastructure: Maykop-Nevinnomyssk Gas Pipeline, Maykop-Samur-Sochi Gas Pipeline
Articles and resources
References
- ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 "Газопровод Ростов - Майкоп". energybase.ru. Retrieved 2022-07-27.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 2.0 2.1 2.2 "Оценка состояния металла магистральных и технологических трубопроводов". Библиотека диссертаций. 2006. Retrieved August 16, 2023.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 3.0 3.1 "Отзывы партнеров ООО "Кубаньнефтегаз"". http://tempobur.ru/. Retrieved August 16, 2023.
{{cite web}}
: External link in
(help)CS1 maint: url-status (link)|website=
- ↑ "Перечень магистральных газопроводов, планируемых для размещения". Правительство России. May 27, 2023. Retrieved August 16, 2023.
{{cite web}}
: CS1 maint: url-status (link)