Rovinari solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Other names: Cef Rovinari, SE Rovinari

Rovinari solar farm is a solar photovoltaic (PV) farm in pre-construction in Rovinari, Gorj County, Olentia, Romania.

Project Details

Table 1: Phase-level project details for Rovinari solar farm

Phase name Status Nameplate capacity Technology Owner Operator
1 Pre-construction[1] 66 MWp/dc[2] PV[1] Tinmar Energy [50%]; Complexul Energetic Oltenia SA [50%][3] Complexul Energetic Oltenia[4]
2 Pre-construction[2] 83 MWp/dc[2] PV[2] Tinmar Energy [50%]; Complexul Energetic Oltenia SA [50%][3]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Rovinari solar farm

Phase Name Location Coordinates (WGS 84)
1 Rovinari, Gorj County, Olentia, Romania[5] 45.9852, 24.6859 (approximate)[5]
2 Rovinari, Gorj County, Olentia, Romania[5] 45.9852, 24.6859 (approximate)[5]

The map below shows the approximate locations of the solar farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 https://web.archive.org/web/20240207131030/https://www.pv-magazine.com/2021/09/17/romanian-energy-company-has-725-mw-of-pv-under-development/. Archived from the original on 2024-02-07. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 "Tinmar Group to invest 150 million Euro in renewable energy in the next three years". Archived from the original on 2024-02-19. Retrieved 2024-01-22.
  3. 3.0 3.1 https://www.pv-tech.org/complexul-energetic-oltenia-signs-contracts-for-735mw-of-new-romanian-solar-power/ https://www.pv-tech.org/complexul-energetic-oltenia-signs-contracts-for-735mw-of-new-romanian-solar-power/, https://www.pv-tech.org/complexul-energetic-oltenia-signs-contracts-for-735mw-of-new-romanian-solar-power/. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  4. https://web.archive.org/web/20240201215807/https://balkangreenenergynews.com/romania-to-build-310-mw-in-solar-power-capacity-in-oltenia-coal-pits/. Archived from the original on 2024-02-01. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 5.2 5.3 https://en.wikipedia.org/wiki/Rovinari https://balkangreenenergynews.com/romania-to-build-310-mw-in-solar-power-capacity-in-oltenia-coal-pits/, https://en.wikipedia.org/wiki/Rovinari. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)