Rozwadów-Strachocina Gas Pipeline

From Global Energy Monitor
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor.
Sub-articles:

Rozwadów-Strachocina Gas Pipeline is a proposed gas pipeline in Poland.

Location

The pipeline is proposed to run from Rozwadów, Poland to Strachocina, Poland.


Loading map...

Project details

  • Operator: Gaz-System S.A
  • Owner: Gaz-System S.A
  • Parent company: Gaz-System S.A[1]
  • Capacity:
  • Length: 140 km
  • Diameter: 1000 mm[2]
  • Status: Proposed[3]
  • Start year:
  • Cost:
  • Financing:
  • Associated infrastructure:

Background

This project is listed in ENTSOG's Ten-Year Network Development plan as a hydrogen-ready pipeline.[2] It is also part of the European Hydrogen Backbone.[1]

In December 2022, GAZ-SYSTEM announced it had signed two contracts for pipeline segments with ANTEA, a Polish engineering company, with an expected completion of design work in 2025.[4] This pipeline, along with the Rozwadów-Końskowola-Wronów Gas Pipeline, would form the Central East Corridor.

Articles and resources

References

  1. 1.0 1.1 [ehb.eu "The European Hydrogen Backbone (EHB) initiative"]. European Hydrogen Backbone. Retrieved Oct 31st, 2022. {{cite web}}: Check |url= value (help); Check date values in: |access-date= (help)CS1 maint: url-status (link)
  2. 2.0 2.1 "TYNDP | ENTSOG". www.entsog.eu. Retrieved 2022-10-31.
  3. "Diversification of gas supply sources and integration of gas infrastructure in the Three Seas Region". 3 Seas Initiative. Retrieved Oct 31st, 2022. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  4. "GAZ-SYSTEM signs news contracts for new pipeline in Poland - CEENERGYNEWS". CEENERGYNEWS. 2022-12-28. Retrieved 2023-01-26.