Rupcha-Vetrino Gas Pipeline
From Global Energy Monitor
Part of the Global Gas Infrastructure Tracker, a Global Energy Monitor project. |
Related categories: |
Rupcha-Vetrino Gas Pipeline is a proposed gas pipeline in Poland.
Location
The pipeline is proposed to run from Rupcha, Bulgaria to Vetrino, Bulgaria.
Project details
- Operator: Bulgartransgaz EAD
- Owner: Bulgartransgaz EAD
- Parent company: Bulgarian Energy Holdings EAD[1]
- Capacity:
- Length: 63 km
- Diameter: 1200 mm[2]
- Status: Proposed[3]
- Start year:
- Cost:
- Financing:
- Associated infrastructure:
Background
This project is listed in ENTSOG's Ten-Year Network Development plan as a hydrogen-ready pipeline (TRA-N-1124).[2] The pipeline will initially carry blended natural gas and Hydrogen, but it is expected to be able to carry 100% Hydrogen. It is also part of the European Hydrogen Backbone.[1]
Articles and resources
References
- ↑ 1.0 1.1 [ehb.eu "The European Hydrogen Backbone (EHB) initiative"]. European Hydrogen Backbone. Retrieved Oct 31st, 2022.
{{cite web}}
: Check|url=
value (help); Check date values in:|access-date=
(help)CS1 maint: url-status (link) - ↑ 2.0 2.1 "TYNDP | ENTSOG". www.entsog.eu. Retrieved 2022-10-31.
- ↑ "Diversification of gas supply sources and integration of gas infrastructure in the Three Seas Region". 3 Seas Initiative. Retrieved Oct 31st, 2022.
{{cite web}}
: Check date values in:|access-date=
(help)CS1 maint: url-status (link)