Rustenberg Platinum Mine solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Other names: Bushveld (Phase Roland)

Rustenberg Platinum Mine solar farm is an announced solar photovoltaic (PV) farm in Rustenburg, Bojanala Platinum District Municipality, North West, South Africa.

Project Details

Table 1: Phase-level project details for Rustenberg Platinum Mine solar farm

Phase name Status Commissioning year Nameplate capacity Technology Owner
Bathopele Announced[1] 2025 (planned)[1] 80 MW[1] PV[1] Sibanye-Stillwater [100%][1]
Karee Announced[1] 2025 (planned)[1] 65 MW[1] PV[1] Sibanye-Stillwater [100%][1]
Roland Announced[1] 2025 (planned)[1] 30 MW[1] PV[1] Sibanye-Stillwater [100%][1]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Rustenberg Platinum Mine solar farm

Phase Name Location Coordinates (WGS 84)
Bathopele Rustenburg, Bojanala Platinum District Municipality, North West, South Africa[2] -25.6789, 27.3085 (approximate)[2]
Karee Rustenburg Local Municipality, Bojanala Platinum District Municipality, North West, South Africa[2] -25.6849, 27.4626 (approximate)[2]
Roland Madibeng Local Municipality, Bojanala Platinum District Municipality, North West, South Africa[2] -25.6802, 27.5188 (approximate)[2]

The map below shows the approximate locations of the solar farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 1.14 https://web.archive.org/web/20240201093433/https://www.agenceecofin.com/energies-renouvelables/0410-92054-afrique-du-sud-sibanye-stillwater-installera-175-mw-d-energie-renouvelable-dans-ses-mines-de-pgm. Archived from the original on 01 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 2.4 2.5 https://web.archive.org/web/20240206220050/https://www.miningweekly.com/article/green-175-mw-power-for-sibanye-stillwater-platinum-group-metals-mines-2021-09-27/rep_id:3650. Archived from the original on 06 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)