SECI 4 solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
SECI 4 solar farm is an operating solar photovoltaic (PV) farm in Rajasthan, India.
Project Details
Table 1: Phase-level project details for SECI 4 solar farm
Phase name | Status | Commissioning year | Nameplate capacity | Technology | Owner |
---|---|---|---|---|---|
1 | Operating[1] | 2021[1] | 250 MWac[1] | PV[2] | IndiGrid[3] |
2 | Operating[4] | 2022[1] | 50 MWac[1] | PV[2] | IndiGrid[3] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for SECI 4 solar farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Rajasthan, India[5] | 25.1862, 75.8589 (approximate)[5] |
2 | Rajasthan, India[5] | 25.1862, 75.8589 (approximate)[5] |
The map below shows the approximate locations of the solar farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 https://web.archive.org/web/20220406154840/https://investor.renewpower.in/static-files/3f203499-97eb-449e-b11c-aa658fd536b4. Archived from the original on 06 April 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 2.0 2.1 "Wiki-Solar Database". 2023-04. Archived from the original on 2024-04-02. Retrieved 2024-02-28.
{{cite web}}
: Check date values in:|date=
(help) - ↑ 3.0 3.1 "IndiGrid completes acquisition of 300 MW solar power plant". pv magazine India. 2024-02-24. Archived from the original on 2024-10-07. Retrieved 2024-09-10.
- ↑ https://web.archive.org/web/20220917175820/https://investor.renewpower.in/static-files/892a5569-955f-4e1d-8f77-de5ca68590b4. Archived from the original on 17 September 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 5.2 5.3 https://web.archive.org/web/20220426155815/https://investor.renewpower.in/static-files/fcb48594-d533-4d45-b638-46ac7d24cff6. Archived from the original on 26 April 2022.
{{cite web}}
: Missing or empty|title=
(help)