Samara power station
Part of the Global Oil and Gas Plant Tracker, a Global Energy Monitor project. |
Related categories: |
Samara power station (Самарская ТЭЦ) is an operating power station of at least 440-megawatts (MW) in Samara, Samara Oblast, Russia with multiple units, some of which are not currently operating.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Samara power station | Samara, Samara Oblast, Russia | 53.2514, 50.2756 (exact)[1][2] |
The map below shows the exact location of the power station.
Unit-level coordinates (WGS 84):
- 1, 2, 3, 4, 4R, 5: 53.2514, 50.2756
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year | Retired year |
---|---|---|---|---|---|---|---|
1 | Operating[3] | fossil gas: natural gas, fossil liquids: heavy fuel oil[4] | 60[5] | steam turbine[6][1] | yes[3] | 1975[6] | – |
2 | Operating[3] | fossil gas: natural gas, fossil liquids: heavy fuel oil[4] | 110[5] | steam turbine[6][1] | yes[3] | 1978[6] | – |
3 | Operating[3] | fossil gas: natural gas, fossil liquids: heavy fuel oil[4] | 110[5] | steam turbine[6][1] | yes[3] | 1978[6] | – |
4 | Operating[3][7] | fossil gas: natural gas, fossil liquids: heavy fuel oil[4] | 110[5] | steam turbine[6][1] | yes[3] | 1978[8][6] | 2024 (planned)[9] |
4R | Pre-construction[10][8][11][12][13] | fossil gas: natural gas, fossil liquids: heavy fuel oil[4] | 125[12][14] | steam turbine[12][14] | yes[3] | 2025 (planned)[8][14][11][15][12][16] | – |
5 | Operating[3] | fossil gas: natural gas, fossil liquids: heavy fuel oil[4] | 50[5] | steam turbine[6][1] | yes[3] | 2002[6] | – |
CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
1 | T Plus PJSC Samara branch [100%][3] | T Plus Group PJSC [100.0%] |
2 | T Plus PJSC Samara branch [100%][3] | T Plus Group PJSC [100.0%] |
3 | T Plus PJSC Samara branch [100%][3] | T Plus Group PJSC [100.0%] |
4 | T Plus PJSC Samara branch [100%][3] | T Plus Group PJSC [100.0%] |
4R | T Plus PJSC Samara branch [100%][3] | T Plus Group PJSC [100.0%] |
5 | T Plus PJSC Samara branch [100%][3] | T Plus Group PJSC [100.0%] |
Background
CHPP is a division of PJSC T Plus. Provides heat and electricity to a third of the residential sector of the regional center and more than five large industrial enterprises in Samara.[17]
Unit 4 is to retire by 2025 and be replaced by 125 MW unit (4R).[18]
In August 2023, it was reported that T Plus had issued the first tranche of financing for the modernization of Unit 4. The total cost of the project is RUR 10.6 billion. The modernization of the plant aims to increase both electrical and heat capacity, enhancing the efficiency of heat and electricity production. The steam turbine, generator, transformer, and auxiliary equipment will undergo comprehensive upgrades. The commissioning of the new unit is scheduled for 2025.[19][20]
A tender for dismantling of Unit 4 was announced by T Plus in December 2023 with the closing date in February 2024.[21] Another tender for replacement of Unit 4 was announced by T Plus in April 2024 with the closing date in May 2024.[22]
Articles and Resources
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 https://energybase.ru/power-plant/Samara_CHP.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.google.com/maps/place/Samarskaya+Tets/@53.251479,50.2743133,628m/data=!3m1!1e3!4m5!3m4!1s0x4166199b1b38d431:0x9463928e035a7de2!8m2!3d53.2514522!4d50.2725608.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.00 3.01 3.02 3.03 3.04 3.05 3.06 3.07 3.08 3.09 3.10 3.11 3.12 3.13 3.14 3.15 3.16 https://web.archive.org/web/20220726093802/https://www.tplusgroup.ru:443/org/samara/organization/samarskaja-tehc/. Archived from the original on 26 July 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 4.2 4.3 4.4 4.5 https://web.archive.org/web/20210830222437/https://www.so-ups.ru/index.php?id=1430. Archived from the original on 30 August 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 5.2 5.3 5.4 https://web.archive.org/web/20210615144832/http://globalenergyobservatory.org/form.php?pid=42040. Archived from the original on 15 June 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 6.0 6.1 6.2 6.3 6.4 6.5 6.6 6.7 6.8 6.9 https://web.archive.org/web/20210830233704/https://ru.wikipedia.org/wiki/%D0%A1%D0%B0%D0%BC%D0%B0%D1%80%D1%81%D0%BA%D0%B0%D1%8F_%D0%A2%D0%AD%D0%A6. Archived from the original on 30 August 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240508021657/https://www.komtender.ru/tender/2859018815. Archived from the original on 08 May 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 8.0 8.1 8.2 https://web.archive.org/web/20230806070504/https://xn--90ab5f.xn--p1ai/press-tsentr/56201/. Archived from the original on 06 August 2023.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220528110218/https://www.niasam.ru/zhkh/t-plyus-nachala-podgotovku-k-modernizatsii-samarskoj-tets-po-dpm-2-188076.html. Archived from the original on 28 May 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://dbe-samara.ru/file/2021/12/%D0%90%D0%BA%D1%82%D1%83%D0%B0%D0%BB%D0%B8%D0%B7%D0%B8%D1%80%D0%BE%D0%B2%D0%B0%D0%BD%D0%BD%D0%B0%D1%8F-%D1%81%D1%85%D0%B5%D0%BC%D0%B0-%D1%82%D0%B5%D0%BF%D0%BB%D0%BE%D1%81%D0%BD%D0%B0%D0%B1%D0%B6%D0%B5%D0%BD%D0%B8%D1%8F-%D0%BD%D0%B0-2022-%D0%B3%D0%BE%D0%B4.pdfб.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 11.0 11.1 (PDF) https://web.archive.org/web/20230313040749/https://www.so-ups.ru/fileadmin/files/company/future_plan/public_discussion/2023/final/60_Samarskaja_oblast_fin.pdf. Archived from the original (PDF) on 13 March 2023.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 12.0 12.1 12.2 12.3 https://web.archive.org/web/20221130155326/https://www.garant.ru/products/ipo/prime/doc/404487690/. Archived from the original on 30 November 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240508021809/https://www.b2b-center.ru/market/generalnyi-podriad-po-ob-ektu-modernizatsiia-samarskoi-tets-s-zamenoi/tender-3633749/. Archived from the original on 08 May 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 14.0 14.1 14.2 (PDF) https://dbe-samara.ru/file/2021/12/%D0%90%D0%BA%D1%82%D1%83%D0%B0%D0%BB%D0%B8%D0%B7%D0%B8%D1%80%D0%BE%D0%B2%D0%B0%D0%BD%D0%BD%D0%B0%D1%8F-%D1%81%D1%85%D0%B5%D0%BC%D0%B0-%D1%82%D0%B5%D0%BF%D0%BB%D0%BE%D1%81%D0%BD%D0%B0%D0%B1%D0%B6%D0%B5%D0%BD%D0%B8%D1%8F-%D0%BD%D0%B0-2022-%D0%B3%D0%BE%D0%B4.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20240120035218/https://www.bigpowernews.ru/photos/0/0_hwMWLFCE8gF4WY3kGoos5DkyfTCuFMXM.pdf. Archived from the original (PDF) on 20 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20240313000812/https://www.so-ups.ru/fileadmin/files/company/future_plan/public_discussion/2024/final/61_Samarskaja_oblast.pdf. Archived from the original (PDF) on 13 March 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ "Самарская ТЭЦ | АО «Системный оператор Единой энергетической системы»". www.so-ups.ru (in русский). Retrieved 2022-11-08.
- ↑ "Приказ Министерства энергетики РФ от 28 февраля 2022 г. № 146 "Об утверждении схемы и программы развития Единой энергетической системы России на 2022 - 2028 годы"".
{{cite web}}
: CS1 maint: url-status (link) - ↑ "ВЭБ.РФ открыл финансирование модернизации Самарской ТЭЦ". вэб.рф. August 1, 2023. Retrieved December 1, 2023.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "СХЕМА И ПРОГРАММА РАЗВИТИЯ ЭЛЕКТРОЭНЕРГЕТИЧЕСКИХ СИСТЕМ РОССИИ НА 2024–2029 ГОДЫ. ЭНЕРГОСИСТЕМА САМАРСКОЙ ОБЛАСТИ" (PDF). So UPS of Russia. November 30, 2023. Retrieved May 7, 2024.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Тендер: выполнение демонтажных работ по объекту "Модернизация Самарской ТЭЦ с заменой ТА ст. №4"". комтендер. December 7, 2024. Retrieved May 7, 2024.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Конкурентные переговоры № 3633749". Центр электронных торгов. April 12, 2024. Retrieved May 7, 2024.
{{cite web}}
: CS1 maint: url-status (link)
Additional data