San Pedro power station (Dominican Republic) (Planta de biomasa San Pedro) is an operating power station of at least 30-megawatts (MW) in San Pedro de Macorís, Dominican Republic with multiple units, some of which are not currently operating.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
San Pedro power station (Dominican Republic) San Pedro de Macorís, San Pedro de Macorís, Dominican Republic 18.4663, -69.3307 (exact)[1]

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • 1, 2: 18.4663, -69.3307

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Start year
1 Operating[2] bioenergy: agricultural waste (solids), bioenergy: wood & other biomass (solids)[2][3] 30[2] 2017[2]
2 Shelved inferred July 2024) bioenergy: agricultural waste (solids), bioenergy: wood & other biomass (solids)[2] 35[4]

Table 3: Unit-level ownership and operator details

Unit name Operator Owner Parent
1 San Pedro Bio Energy[2][3] San Pedro Bio Energy SRL [100%][2][3] San Pedro Bio Energy SRL [100.0%]
2 San Pedro Bio Energy[2][3] San Pedro Bio Energy SRL [100%][2][3] San Pedro Bio Energy SRL [100.0%]

Articles and Resources

References

  1. https://goo.gl/maps/8m8R6bCmSdvdvncf7. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 https://web.archive.org/web/20221203120017/https://spbesa.com/en/corporate-profile/. Archived from the original on 03 December 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  3. 3.0 3.1 3.2 3.3 3.4 (PDF) https://web.archive.org/web/20220808053454/https://sie.gob.do/wp-content/uploads/2021/06/SIE-032-2017-PS_-_AUT_PUESTA_SERV_DEFINITIVA_SAN_PEDRO_BIOENERGY.pdf. Archived from the original (PDF) on 08 August 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  4. https://web.archive.org/web/20221207175611/https://www.pv-magazine-latam.com/2022/03/10/tres-acuerdos-para-inyectar-128-mw-renovables-al-este-de-dominicana/. Archived from the original on 07 December 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)

Additional data

To access additional data, including an interactive map of bioenergy power stations, a downloadable dataset, and summary data, please visit the Global Bioenergy Power Tracker on the Global Energy Monitor website.