Saratov CHP-2 power station
Part of the Global Oil and Gas Plant Tracker, a Global Energy Monitor project. |
Related categories: |
Saratov CHP-2 power station (Саратовская ТЭЦ-2) is an operating power station of at least 110-megawatts (MW) in Saratov, Saratov Oblast, Russia with multiple units, some of which are not currently operating.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Saratov CHP-2 power station | Saratov, Saratov Oblast, Russia | 51.45278, 45.917642 (exact)[1] |
The map below shows the exact location of the power station.
Unit-level coordinates (WGS 84):
- 5, 8, СС1: 51.45278, 45.917642
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year |
---|---|---|---|---|---|---|
5 | Operating[2][3] | fossil liquids: heavy fuel oil, fossil gas: natural gas[4][5] | 60[4][6] | steam turbine[7] | yes[2] | 1962[4] |
8 | Operating[2] | fossil liquids: heavy fuel oil, fossil gas: natural gas[4] | 50[4] | steam turbine[7] | yes[2] | 1969[4] |
СС1 | Announced[8][6][9][10][11] | fossil gas: natural gas[11] | 115[11] | combined cycle[11] | yes[12][2] | 2028 (planned)[11][13][6] |
CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
5 | T Plus PJSC Saratov Branch [100%][2] | T Plus Group PJSC [100.0%] |
8 | T Plus PJSC Saratov Branch [100%][2] | T Plus Group PJSC [100.0%] |
СС1 | T Plus PJSC Saratov Branch [100%][2] | T Plus Group PJSC [100.0%] |
Background
The new unit CC1 (also referred to as "11, 12 CC-115"; Russian: "11, 12 ПГУ-115") was mentioned in the company plan,[14] news in May 2021[15] and listed in the Ministry of Energy 2022-2028 energy program, released in February 2022,[16] and the Ministry of Energy 2023-2028 energy program, released in February 2023.[17] A few news sources caused a confusion mistaking Saratov CHP-2 with Saratov CHP-1.[18][19][20] Once the new unit becomes operational, the old equipment will be retired.[21] As of December 2023, there have not been any updates about the project. The turbine for the project (GTE-65) was to by supplied by Russia's Power Machines. However, in January 2024 it was reported that T Plus was considering to give up the project, partly because it could not obtain the final price of the turbine.[22]
Articles and Resources
References
- ↑ https://web.archive.org/web/20210831000044/https://www.industryabout.com/country-territories-3/2137-russia/fossil-fuels-energy/32748-saratovskaya-tec-2-gas-power-plant. Archived from the original on 31 August 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 https://web.archive.org/web/20220305222941/http://www.tplusgroup.ru/org/saratov/organization/saratovskaja-tehc-2/. Archived from the original on 05 March 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ https://www.eprussia.ru/news/base/2022/9064660.htm.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 4.2 4.3 4.4 4.5 https://web.archive.org/web/20220305222941/http://www.tplusgroup.ru/org/saratov/organization/saratovskaja-tehc-2/. Archived from the original on 05 March 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20240313080900/https://www.so-ups.ru/fileadmin/files/company/future_plan/public_discussion/2024/final/63_Saratovskaja_oblast.pdf. Archived from the original (PDF) on 13 March 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 6.0 6.1 6.2 (PDF) https://web.archive.org/web/20230313040328/https://www.so-ups.ru/fileadmin/files/company/future_plan/public_discussion/2023/final/61_Saratovskaja_oblast_fin.pdf. Archived from the original (PDF) on 13 March 2023.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 7.0 7.1 https://web.archive.org/web/20210615130917/http://globalenergyobservatory.org/form.php?pid=42049. Archived from the original on 15 June 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240120035048/https://base.garant.ru/406504497/. Archived from the original on 20 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20210619031547/https://www.in-power.ru/news/novostitek/37844-po-itogam-kommod-pgu-2027-2029-opredeleny-buduschie-obekty-opytno-promyshlennoi-eks.html. Archived from the original on 19 June 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20230803101842/https://www.business-vector.info/t-pljus-minus-vagner-161332/. Archived from the original on 03 August 2023.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 11.0 11.1 11.2 11.3 11.4 https://web.archive.org/web/20221130155326/https://www.garant.ru/products/ipo/prime/doc/404487690/. Archived from the original on 30 November 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20201124202806/https://www.in-power.ru/places/161-saratovskaja-tec-2.html. Archived from the original on 24 November 2020.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20240120035218/https://www.bigpowernews.ru/photos/0/0_hwMWLFCE8gF4WY3kGoos5DkyfTCuFMXM.pdf. Archived from the original (PDF) on 20 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ ПАО «Т Плюс». "Реализация программы ДПМ-2". ПАО «Т Плюс» (in русский). Retrieved 2023-04-14.
- ↑ https://web.archive.org/web/20210619031547/https://www.in-power.ru/news/novostitek/37844-po-itogam-kommod-pgu-2027-2029-opredeleny-buduschie-obekty-opytno-promyshlennoi-eks.html.
{{cite web}}
:|archive-url=
requires|archive-date=
(help); Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20221130155326/https://www.garant.ru/products/ipo/prime/doc/404487690/.
{{cite web}}
:|archive-url=
requires|archive-date=
(help); Missing or empty|title=
(help) - ↑ "Cхема и программа развития Единой энергетической системы России на 2023-2028 годы" (PDF). 2023.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "www.bigpowernews.ru/markets/document97997.phtml". Archived from the original on July 8, 2022. Retrieved July 13, 2022.
- ↑ "«Т Плюс» оценил российскую турбину". May 19, 2021. Archived from the original on July 8, 2022. Retrieved July 13, 2022.
- ↑ "«Т Плюс» раскрыла стоимость двух проектов экспериментальных энергоблоков на российских турбинах". Energetika i Promyshlennost' Rossiyi (EP Russia). May 20, 2021. Retrieved May 4, 2021.
- ↑ "«Т Плюс» минус Вагнер — гендиректор вылетел из компании на турбине для Саратовской ТЭЦ-2". www.business-vector.info. April 18, 2023. Retrieved December 1, 2023.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Ъ: «Т Плюс» хочет отказаться от проектов модернизации ТЭЦ с турбинами «Силмаша»". peretok.ru. January 22, 2024. Retrieved May 6, 2024.
{{cite web}}
: CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.