Sateri Jiangxi Chemical Fiber Co captive power station (赛得利(江西)化纤自备电厂) is an operating power station of at least 165-megawatts (MW) in Gutang Town, Lushan, Jiujiang, Jiangxi, China. It is also known as Saideli Jiangxi Chemical Fiber Co captive power station.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Sateri Jiangxi Chemical Fiber Co captive power station | Gutang Town, Lushan, Jiujiang, Jiangxi, China | 29.62466, 116.122946 (exact) |
The map below shows the exact location of the power station.
Unit-level coordinates (WGS 84):
- Unit 3, Unit 4: 29.62466, 116.122946
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | Start year |
---|---|---|---|---|---|
Unit 3 | operating | coal: unknown | 40 | subcritical | 2011 |
Unit 4 | operating | coal: unknown | 125 | subcritical | 2020 |
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
Unit 3 | Saideli (China) Fiber Co Ltd [100%] | Sateri International (Singapore) Pte Ltd [100.0%] |
Unit 4 | Saideli (China) Fiber Co Ltd [100%] | Sateri International (Singapore) Pte Ltd [100.0%] |
Project-level captive use details
- Captive industry use (heat or power): both
- Captive industry: Chemicals
Background
The Sateri Jiangxi Chemical Fiber Company captive power station was commissioned in 2020 to provide electricity to the facilities of the Sateri (also known as Saideli) Jiangxi Chemical Fiber Company. The facility specializes in cellulose fiber and is the newest addition to the Sateri Group's cellulose fiber plants, having been completed in 2020. The cellulose fiber plant has two production lines with a total annual output of 250,000 tons.[1] The entire facility (including the Sateri Jiangxi Chemical Fiber Company captive power plant) had a total investment of 12 billion RMB.[2]
Other sources appeared to reference a 40 MW coal-fired power unit,[3] which could have gone into operation around 2011.
Articles and Resources
References
- ↑ "Our Operations". Sateri (in 中文(中国大陆)). Retrieved 2021-07-29.
- ↑ "赛得利在九江的第三个纤维素纤维项目正式开工" (PDF). RGEI. 2017-11-27. Retrieved 2021-07-29.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "t20140326_104233," JXDPC, archive
Additional data
To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.