Seival power station
Part of the Global Coal Plant Tracker, a Global Energy Monitor project. |
Related coal trackers: |
Seival power station (Usina Termelétrica Seival) is a cancelled power station in Seival, Rio Grande do Sul, Brazil.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Seival power station | Seival, Rio Grande do Sul, Brazil | -31.454444, -53.746389 (approximate) |
The map below shows the approximate location of the power station.
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology |
---|---|---|---|---|
Unit 1 | cancelled | coal: unknown | 300 | subcritical |
Unit 2 | cancelled | coal: unknown | 300 | subcritical |
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
Unit 1 | Copelmi Mineração Ltda [100%] | Copelmi Mineração Ltda [100.0%] |
Unit 2 | Copelmi Mineração Ltda [100%] | Copelmi Mineração Ltda [100.0%] |
Project-level coal details
- Coal source(s): Seival mine
Background
The 600 MW Seival project was initiated by Tractebel Energia S.A., then acquired by MPX Energia SA (subsequently renamed Eneva) in November 2010. The project has already been granted an installation license and would be supplied with coal from the proposed Seival mine in southern Rio Grande do Sul state.[1]
Eneva originally planned to place a bid for the Seival plant in Brazil's December 2013 national energy auction, but opted out due to unviably low energy prices.[2]
In September 2014, Eneva renewed its license for Seival[3], and in November 2014, higher energy prices encouraged Eneva to enter the Seival project in Brazil's national energy auction.[4][5]
Seival ultimately lost out in the bidding to the Pampa Sul power station.[6] The 600MW Seival project was listed once again as a participant in Brazil's A-5 energy auction in April 2015[7], but was passed over in favor of hydroelectric, natural gas- and biomass-fueled power projects.[8]
In May 2019 Copelmi acquired the rights to develop Eneva's coal-fired power projects in Candiota, including the 600 MW Seival power station. Noting that Seival's previous environmental license had already expired, company executive Roberto Faria announced that Copelmi would instead pursue development of Eneva's 727 MW Sul power station, to be renamed Nova Seival power station.[9] There has been no subsequent news about the 600 MW Seival project and it appears to be cancelled.
Articles and Resources
References
- ↑ "MPX finaliza compra da Seival". Exame. 2011-06-07.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Uma luz para o carvão: leilão renova chances de projetos de R$ 12,7 bilhões saírem do papel". GZH. 2013-08-24.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Usinas térmicas pedem prazo para evitar repetição de crise,", Epoca Negocios, September 18, 2014.
- ↑ "Carvão Mineral tem quatro projetos inscritos para o leilão de energia A-5,", SieceSC, July 1, 2014.
- ↑ "Duas usinas da região concorrem no leilão A-5". Jornal Minuano. August 28, 2014.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Confirmada nova usina em Candiota". Jornal Minuano. November 29, 2014.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Leilão A-5 2015 cadastra 19.826 MW em novos projetos de energia, diz EPE". Reuters. 2015-02-05.
- ↑ "Homologado resultado do primeiro Leilão A-5 de 2015 - Agência Nacional de Energia Elétrica - ANEEL". ANEEL. July 28, 2015.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Copelmi busca licença ambiental para concorrer em leilão de energia de setembro". Jornal Minuano. May 10, 2019.
Additional data
To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.