Senboku No.1 Connection Pipeline

From Global Energy Monitor
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor.
Sub-articles:

Senboku No.1 Connection Pipeline (泉北第1連絡管) is an operating natural gas pipeline in Japan.[1]

Location

The pipeline runs from Senboku No.1 Plant (泉北第1工場) to Senboku No.2 Plant (泉北第2工場) in the port of Sakai-Semboku, Kansai, Japan[2]

Loading map...

Project Details

  • Operator: Osaka Gas[3]
  • Owner: Osaka Gas[3]
  • Parent Company: Osaka Gas[3]
  • Capacity:
  • Length: 3.1 miles / 5 km[3]
  • Diameter: 600 mm[3]
  • Status: Operating[3][4]
  • Start Year: 1975[3]
  • Cost:
  • Financing:
  • Associated Infrastructure:

Background

The pipeline has a diameter of 600mm and a max operating pressure of 2.5 MPa.[3]

Articles and resources

References

  1. Osaka Gas Group’s Businesses, Osaka Gas, February 2019
  2. Toshiro Otsuka Evolution of an LNG Terminal: Senboku Terminal of Osaka Gas 23rd World Gas Conference, Amsterdam 2006
  3. 3.0 3.1 3.2 3.3 3.4 3.5 3.6 3.7 東京ガス、大阪ガス及び東邦ガスの事業概況(詳細) METI, accessed Dec 2019
  4. "Daigas Group Annual Report 2019" (PDF). Daigas Group. Retrieved 2024-08-10.{{cite web}}: CS1 maint: url-status (link)

Related GEM.wiki articles

External resources

External articles