Serra De La Creu wind farm (Parc eòlic Serra de la Creu) is a wind farm in pre-construction in Tivissa, Ribera d'Ebre, Cataluña, Spain.
Project Details
Table 1: Phase-level project details for Serra De La Creu wind farm
Phase name | Status | Nameplate capacity | Type | Owner |
---|---|---|---|---|
1 | Pre-construction[1] | 44 MW[2] | Onshore[2] | Energias Renovables De Anat SL [100%][2] |
2 | Shelved (inferred February 2024) | 12 MW[3] | Onshore[3] | Energias Renovables De Heset SL [100%][3] |
3 | Shelved (inferred February 2024) | 49.4 MW[4] | Onshore[4] | Fernando Samper Rivas [100%][4] |
4 | Shelved (inferred February 2024) | 49.4 MW[5] | Onshore[5] | Energias Renovables De Isis SL [100%][5] |
5 | Pre-construction[6] | 22 MW[6] | Onshore[6] | Energias Renovables De Maat SL [100%][6] |
Location
Table 2: Phase-level location details for Serra De La Creu wind farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Tivissa, Ribera d'Ebre, Cataluña, Spain[2] | 41.0416, 0.7346 (approximate)[2] |
2 | el Perelló, Baix Ebre, Cataluña, Spain[3] | 40.8754, 0.7124 (approximate)[3] |
3 | Tortosa, Baix Ebre, Cataluña, Spain[4] | 40.8110, 0.5209 (approximate)[4] |
4 | el Perelló, Baix Ebre, Cataluña, Spain[5] | 40.8754, 0.7124 (approximate)[5] |
5 | Rasquera, Ribera d'Ebre, Cataluña, Spain[6] | 41.0036, 0.5988 (approximate)[6] |
The map below shows the approximate locations of the wind farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ (PDF) https://mediambient.gencat.cat/web/.content/home/ambits_dactuacio/avaluacio_ambiental/banc_dades_avaluacio_ambiental/pendents-publicacio-dogc/resolucions/1_me00264_otaate20230184_pe_serra_de_la_creu1_dia.pdf https://ebredigital.cat/2022/12/12/comenca-la-tramitacio-duna-nova-central-eolica-amb-vuit-aerogeneradors-al-terme-de-tivissa/, https://mediambient.gencat.cat/web/.content/home/ambits_dactuacio/avaluacio_ambiental/banc_dades_avaluacio_ambiental/pendents-publicacio-dogc/resolucions/1_me00264_otaate20230184_pe_serra_de_la_creu1_dia.pdf.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 2.4 "Acord de 7 de setembre de 2023, de declaració d'impacte ambiental del Parc eòlic Serra de la Creu 1, promogut per l'empresa ENERGIAS RENOVABLES DE ANAT, SL, al terme municipal de Tivissa" (PDF). Generalitat de Catalunya. 2023-09-07. Archived from the original (PDF) on 2024-02-19.
- ↑ 3.0 3.1 3.2 3.3 3.4 "Acta de PLE ordinari de 29 de juny de 2021" (PDF). Ajuntament del Perelló. 2021-06-29. Archived from the original (PDF) on 2024-02-19.
- ↑ 4.0 4.1 4.2 4.3 4.4 "Acord sobre la viabilitat de l'emplaçament del parc eòlic Serra de la Creu 3, promogut per FERNANDO SAMPER RIVAS al terme municipal de Tortosa, el Perelló, l'Ametlla de Mar, Tivissa I, Vandellòs i l'Hospitalet de l'Infant". Generalitat de Catalunya. 2020-09-10. Archived from the original on 2024-02-19.
- ↑ 5.0 5.1 5.2 5.3 5.4 "Acord sobre la viabilitat de l'emplaçament del parc eòlic Serra de la Creu 4, promogut per ENERGIAS RENOVABLES DE ISIS, S.L, al terme municipal del Perelló, l'Ametlla de Mar, Tivissa I, Vandellòs i l'Hospitalet de l'Infant". Generalitat de Catalunya. 2020-09-10. Archived from the original on 2024-02-19.
- ↑ 6.0 6.1 6.2 6.3 6.4 6.5 "RESOLUCIÓN ACC/3827/2023, de 11 de noviembre, de la Dirección General de Energía, por la que se deniega a la empresa Energías Renovables de Maat, SL, la autorización administrativa previa y de construcción del parque eólico Serra de la Creu 5". Boletín Oficial de Cataluña. 2023-11-20. Archived from the original on 2024-02-19. Retrieved 2024-02-02.