Serra Do Barroso wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Other names: Parque Eólico da Serra do Barroso (Phase 1), Parque Eólico da Serra do Barroso 3 (Phase 3), Parque Eólico da Serra do Barroso 2 (Phases 2, 2.2, 3.2)

Serra Do Barroso wind farm is an operating wind farm in Vila Real, Portugal.

Project Details

Table 1: Phase-level project details for Serra Do Barroso wind farm

Phase name Status Commissioning year Nameplate capacity Type Owner Operator
1 Operating[1] 2003[1] 18 MW[1] Onshore[2] EDP Renováveis [100%][3] Eólica da Serra das Alturas SA[1][3]
2 Operating[4] 2009[4] 10 MW[4] Onshore[2] EDP Renováveis [100%][3] Eólica da Serra das Alturas SA[5]
2.2 Operating[2] 2011[2] 2 MW[2] Onshore[2]
3 Operating[4] 2009[4] 16 MW[4] Onshore[2] EDP Renováveis [100%][3] Eólica do Alto do Mourisco SA[6]
3.2 Operating[2] 2014[2] 6 MW[2] Onshore[2]

Location

Table 2: Phase-level location details for Serra Do Barroso wind farm

Phase Name Location Coordinates (WGS 84)
1 Vila Real, Portugal[7] 41.6856, -7.8728 (exact)[7]
2 Vila Real, Portugal[8] 41.6917, -7.8431 (exact)[8]
2.2 Portugal[2] 41.6781, -7.9999 (approximate)[2]
3 Vila Real, Portugal[9] 41.6806, -7.8497 (exact)[9]
3.2 Portugal[2] 41.6781, -7.9999 (approximate)[2]

The map below shows the locations of the wind farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 https://web.archive.org/web/20240126035855/https://www.rtp.pt/noticias/article/content/1545996. Archived from the original on 26 January 2024. {{cite web}}: Missing or empty |title= (help)
  2. 2.00 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.10 2.11 2.12 2.13 2.14 (PDF) https://web.archive.org/web/20220630075400/http://e2p.inegi.up.pt/relatorios/Portugal_parques_eolicos_2021.pdf. Archived from the original (PDF) on 30 June 2022. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 3.3 (PDF) https://web.archive.org/web/20210927190903/https://web3.cmvm.pt/sdi/emitentes/docs/PC78308.pdf. Archived from the original (PDF) on 27 September 2021. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 4.2 4.3 4.4 4.5 (PDF) https://web.archive.org/web/20240126035327/https://www.apren.pt/contents/documents/portugal-parques-eolicos-2018.pdf. Archived from the original (PDF) on 26 January 2024. {{cite web}}: Missing or empty |title= (help)
  5. (PDF) https://web.archive.org/web/20240131072109/https://www.dgeg.gov.pt/media/fhmnya1l/i011360.pdf. Archived from the original (PDF) on 31 January 2024. {{cite web}}: Missing or empty |title= (help)
  6. (PDF) https://web.archive.org/web/20240131072918/https://siaia.apambiente.pt/AIADOC/AIA2627/RNT2627.pdf. Archived from the original (PDF) on 31 January 2024. {{cite web}}: Missing or empty |title= (help)
  7. 7.0 7.1 https://web.archive.org/web/20240201001531/https://www.thewindpower.net/windfarm_en_642.php. Archived from the original on 01 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  8. 8.0 8.1 https://web.archive.org/web/20240201001436/https://www.thewindpower.net/windfarm_en_6818.php. Archived from the original on 01 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  9. 9.0 9.1 https://web.archive.org/web/20240201001510/https://www.thewindpower.net/windfarm_en_6819.php. Archived from the original on 01 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)