Shagaya Wind Project
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Other names: Al Shaqaya
Shagaya Wind Project is an operating wind farm in Jahra, Kuwait.
Project Details
Table 1: Phase-level project details for Shagaya Wind Project
Phase name | Status | Commissioning year | Nameplate capacity | Type | Owner | Operator |
---|---|---|---|---|---|---|
1 | Operating[1] | 2017[1] | 10 MW[1] | Onshore[2] | Kuwait Institute for Scientific Research [100%] (معهد الكويت للأبحاث العلمية)[1] | Alghanim International; Elecnor Group[3] |
2a | Cancelled[4] | – | 50 MW[5] | Onshore[2] | – | – |
2b | Cancelled[4] | – | 50 MW[6] | Onshore[2] | – | – |
Location
Table 2: Phase-level location details for Shagaya Wind Project
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Jahra, Kuwait[7] | 29.2285, 47.0630 (exact)[7] |
2a | Jahra, Kuwait[7] | 29.2285, 47.0630 (exact)[7] |
2b | Jahra, Kuwait[7] | 29.2285, 47.0630 (exact)[7] |
The map below shows the exact locations of the wind farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 https://web.archive.org/web/20240125190456/https://www.kisr.edu.kw/en/gi/3/details/. Archived from the original on 2024-01-25.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 https://web.archive.org/web/20240126082932/https://www.thewindpower.net/windfarm_en_27194_shagaya.php. Archived from the original on 2024-01-26.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.evwind.es/2015/04/20/wind-energy-in-kuwait-elecnor-built-the-first-wind-farm/51597 https://www.evwind.es/2015/04/20/wind-energy-in-kuwait-elecnor-built-the-first-wind-farm/51597, https://www.evwind.es/2015/04/20/wind-energy-in-kuwait-elecnor-built-the-first-wind-farm/51597.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ 4.0 4.1 https://www.solarpaces.org/kuwaits-rfp-for-200-mw-of-csp-has-begun/ https://www.zawya.com/en/projects/utilities/kuwait-to-launch-rfq-for-39bln-shaghaya-solar-power-project-in-2-3-months-ministry-official-cmi3ltuy, https://www.solarpaces.org/kuwaits-rfp-for-200-mw-of-csp-has-begun/.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ https://www.aljarida.com/articles/1462311951431957500 https://www.middleeast-energy.com/content/dam/Informa/Middle-East-Electricity/middle-east-energy-2021/reports-mee/MEE_Mesia_Report_v3.pdf, https://www.aljarida.com/articles/1462311951431957500.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ https://www.aljarida.com/articles/1462311951431957500/ https://www.aljarida.com/articles/1462311951431957500, https://www.aljarida.com/articles/1462311951431957500/.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ 7.0 7.1 7.2 7.3 7.4 7.5 https://web.archive.org/web/20211106103536/https://www.google.com/maps/place/Shagaya+Renewable+Energy+Park/@29.2282996,47.0602265,928m/data=%213m1%211e3%214m5%213m4%211s0x3fda9956dad7a285:0x99f3c42284eada49%218m2%213d29.2282996%214d47.0624152%215m1%211e4?shorturl=1. Archived from the original on 06 November 2021.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help)