Shanwei Honghaiwan power station
Part of the Global Coal Plant Tracker, a Global Energy Monitor project. |
Related coal trackers: |
Shanwei Honghaiwan power station (粤电广东红海湾发电公司汕尾电厂) is an operating power station of at least 2520-megawatts (MW) in Dongzhou, Cheng, Shanwei, Guangdong, China with multiple units, some of which are not currently operating. It is also known as 汕尾电厂二期5、6号机组(2×1000MW)扩建工程.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Shanwei Honghaiwan power station | Dongzhou, Cheng, Shanwei, Guangdong, China | 22.70695, 115.55529 (exact) |
The map below shows the exact location of the power station.
Unit-level coordinates (WGS 84):
- Phase I Unit 1, Phase I Unit 2, Phase II Unit 3, Phase II Unit 4, Phase III Unit 5, Phase III Unit 6: 22.70695, 115.55529
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | Start year |
---|---|---|---|---|---|
Phase I Unit 1 | operating | coal: bituminous | 600 | supercritical | 2008 |
Phase I Unit 2 | operating | coal: bituminous | 600 | supercritical | 2008 |
Phase II Unit 3 | operating | coal: bituminous | 660 | ultra-supercritical | 2011 |
Phase II Unit 4 | operating | coal: bituminous | 660 | ultra-supercritical | 2011 |
Phase III Unit 5 | permitted | coal: bituminous | 1000 | ultra-supercritical | 2025 (planned) |
Phase III Unit 6 | permitted | coal: bituminous | 1000 | ultra-supercritical | 2025 (planned) |
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
Phase I Unit 1 | Guangdong Red Bay Power Generation Co Ltd [100%] | Guangdong Electric Power Development Co Ltd [65.0%]; Guangzhou Development Group Inc [25.0%]; Shanwei Investment Holding Co Ltd [10.0%] |
Phase I Unit 2 | Guangdong Red Bay Power Generation Co Ltd [100%] | Guangdong Electric Power Development Co Ltd [65.0%]; Guangzhou Development Group Inc [25.0%]; Shanwei Investment Holding Co Ltd [10.0%] |
Phase II Unit 3 | Guangdong Red Bay Power Generation Co Ltd [100%] | Guangdong Electric Power Development Co Ltd [65.0%]; Guangzhou Development Group Inc [25.0%]; Shanwei Investment Holding Co Ltd [10.0%] |
Phase II Unit 4 | Guangdong Red Bay Power Generation Co Ltd [100%] | Guangdong Electric Power Development Co Ltd [65.0%]; Guangzhou Development Group Inc [25.0%]; Shanwei Investment Holding Co Ltd [10.0%] |
Phase III Unit 5 | Guangdong Red Bay Power Generation Co Ltd [100%] | Guangdong Electric Power Development Co Ltd [65.0%]; Guangzhou Development Group Inc [25.0%]; Shanwei Investment Holding Co Ltd [10.0%] |
Phase III Unit 6 | Guangdong Red Bay Power Generation Co Ltd [100%] | Guangdong Electric Power Development Co Ltd [65.0%]; Guangzhou Development Group Inc [25.0%]; Shanwei Investment Holding Co Ltd [10.0%] |
Project-level coal details
Background
Shanwei Honghaiwan power station is a four-unit coal-fired power plant with a total capacity of 2,520 MW in Guangdong Province. The first two units, totaling 1,200 MW, were completed in 2008. Units 3 & 4, totaling 1,320 MW, were completed in 2010-11. The plant is owned by Guangdong Yudean Group.[2]
Description of Expansion
The power plant was originally designed for 4 x 600 MW and 4 x 1,000 MW. Guangdong Elec Power Dev Co was moving forward with the second phase of the plant for a total of 2,000 MW of additional capacity, and the feasibility study was completed in 2014.[3] [4]
Due to new restrictions announced during 2016 by the National Energy Administration and the National Development and Reform Commission, further capacity expansions at this location appeared to be on hold or cancelled. For details, see China's 2016 Restrictions on Development of Coal-Fired Power Capacity.
However, in late 2022, an expansion was put up for expedited public consultation ("The publicity period is from December 14, 2022 to December 16, 2022" only),[5] and permitted December 21, 2022.[6]
Articles and Resources
References
- ↑ 1.0 1.1 https://web.archive.org/web/20240125124415/http://drc.gd.gov.cn/gkmlpt/content/4/4069/post_4069180.html#866. Archived from the original on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ "广东红海湾发电有限公司," Guangdong Yudean Group, 2013-6-6
- ↑ "汕尾电厂二期5、6号机组(2×1000MW)扩建工程可行性研究报告审查会顺利召开," Guangdong Elec Power Dev Co, 2014-03-18
- ↑ "广东红海湾发电有限公司"Guangdong Yudean Group, 2016-5-31
- ↑ 汕尾电厂二期5、6号机组(2×1000MW)扩建工程核准前的公示, BJX News, 2022-12-15
- ↑ "汕尾电厂二期5、6号机组(2×1000MW)扩建工程项目获得核准批复," BJX, 2022-12-23