Shanxi Liulin power station

From Global Energy Monitor
Part of the
Global Coal Plant Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related coal trackers:

Shanxi Liulin power station (山西国际能源柳林发电厂) is an operating power station of at least 1400-megawatts (MW) in Xuecun Town, Liulin, Lüliang, Shanxi, China. It is also known as Liulin Huaguang power station 柳林华光热电厂 (Phase II Unit 3, Phase II Unit 4), Liulin Huaguang power station (Phase I Unit 1, Phase I Unit 2), Liulin Liansheng power station.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Shanxi Liulin power station Xuecun Town, Liulin, Lüliang, Shanxi, China 37.4185467, 110.8243489 (exact)

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • Phase I Unit 1, Phase I Unit 2, Phase II Unit 3, Phase II Unit 4: 37.4185467, 110.8243489

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year
Phase I Unit 1 operating coal: unknown 100 subcritical 1995
Phase I Unit 2 operating coal: unknown 100 subcritical 1996
Phase II Unit 3 operating coal: unknown 600 subcritical 2008
Phase II Unit 4 operating coal: unknown 600 subcritical 2008

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Phase I Unit 1 Shanxi Liulin Electric Power Co Ltd [100%] Shanxi State-Owned Capital Investment and Operation Co Ltd [42.3%]; KEPCO Shanxi International [34.0%]; KEPCO Woori sprott Global Prive [8.0%]; Power Development [7.0%]; Shanxi Gemeng International Energy Group Co Ltd [4.7%]; other [4.0%]
Phase I Unit 2 Shanxi Liulin Electric Power Co Ltd [100%] Shanxi State-Owned Capital Investment and Operation Co Ltd [42.3%]; KEPCO Shanxi International [34.0%]; KEPCO Woori sprott Global Prive [8.0%]; Power Development [7.0%]; Shanxi Gemeng International Energy Group Co Ltd [4.7%]; other [4.0%]
Phase II Unit 3 Shanxi Huaguang Power Generation Co Ltd [100%] China Huaneng Group Co Ltd [40.0%]; Shanxi State-Owned Capital Investment and Operation Co Ltd [21.2%]; KEPCO Shanxi International [17.0%]; Shanxi Coking Coal Energy Group Co Ltd [10.0%]; KEPCO Woori sprott Global Prive [4.0%]; Power Development [3.5%]; Shanxi Gemeng International Energy Group Co Ltd [2.4%]; other [2.0%]
Phase II Unit 4 Shanxi Huaguang Power Generation Co Ltd [100%] China Huaneng Group Co Ltd [40.0%]; Shanxi State-Owned Capital Investment and Operation Co Ltd [21.2%]; KEPCO Shanxi International [17.0%]; Shanxi Coking Coal Energy Group Co Ltd [10.0%]; KEPCO Woori sprott Global Prive [4.0%]; Power Development [3.5%]; Shanxi Gemeng International Energy Group Co Ltd [2.4%]; other [2.0%]

Background

Shanxi Liulin power station originally consisted of four units totaling 1400 MW. The first two units of 100 MW each were put into operation in 1995 and 1996, respectively, at a total investment of 1.1 billion yuan. The units were funded through loans from the Asian Development Bank (ADB).[1][2]

In 2008 two more units of 600 MW each began operation.[3]

New units were also built at the related Liulin Liansheng power station.

Articles and Resources

References

  1. "Shanxi Liulin Power Generation Co. Ltd," Shanxi International Energy Group website, accessed October 2014
  2. 关于山西柳林联盛煤矸石综合利用电厂二期工程, mee.gov.cn, 2014-08-20
  3. "Development History," Shanxi International Energy Group website, accessed October 2014

Additional data

To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.