Shanxi Liulin power station
Part of the Global Coal Plant Tracker, a Global Energy Monitor project. |
Related coal trackers: |
Shanxi Liulin power station (山西国际能源柳林发电厂) is an operating power station of at least 1400-megawatts (MW) in Xuecun Town, Liulin, Lüliang, Shanxi, China. It is also known as Liulin Huaguang power station 柳林华光热电厂 (Phase II Unit 3, Phase II Unit 4), Liulin Huaguang power station (Phase I Unit 1, Phase I Unit 2), Liulin Liansheng power station.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Shanxi Liulin power station | Xuecun Town, Liulin, Lüliang, Shanxi, China | 37.4185467, 110.8243489 (exact) |
The map below shows the exact location of the power station.
Unit-level coordinates (WGS 84):
- Phase I Unit 1, Phase I Unit 2, Phase II Unit 3, Phase II Unit 4: 37.4185467, 110.8243489
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | Start year |
---|---|---|---|---|---|
Phase I Unit 1 | operating | coal: unknown | 100 | subcritical | 1995 |
Phase I Unit 2 | operating | coal: unknown | 100 | subcritical | 1996 |
Phase II Unit 3 | operating | coal: unknown | 600 | subcritical | 2008 |
Phase II Unit 4 | operating | coal: unknown | 600 | subcritical | 2008 |
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
Phase I Unit 1 | Shanxi Liulin Electric Power Co Ltd [100%] | Shanxi State-Owned Capital Investment and Operation Co Ltd [42.3%]; KEPCO Shanxi International [34.0%]; KEPCO Woori sprott Global Prive [8.0%]; Power Development [7.0%]; Shanxi Gemeng International Energy Group Co Ltd [4.7%]; other [4.0%] |
Phase I Unit 2 | Shanxi Liulin Electric Power Co Ltd [100%] | Shanxi State-Owned Capital Investment and Operation Co Ltd [42.3%]; KEPCO Shanxi International [34.0%]; KEPCO Woori sprott Global Prive [8.0%]; Power Development [7.0%]; Shanxi Gemeng International Energy Group Co Ltd [4.7%]; other [4.0%] |
Phase II Unit 3 | Shanxi Huaguang Power Generation Co Ltd [100%] | China Huaneng Group Co Ltd [40.0%]; Shanxi State-Owned Capital Investment and Operation Co Ltd [21.2%]; KEPCO Shanxi International [17.0%]; Shanxi Coking Coal Energy Group Co Ltd [10.0%]; KEPCO Woori sprott Global Prive [4.0%]; Power Development [3.5%]; Shanxi Gemeng International Energy Group Co Ltd [2.4%]; other [2.0%] |
Phase II Unit 4 | Shanxi Huaguang Power Generation Co Ltd [100%] | China Huaneng Group Co Ltd [40.0%]; Shanxi State-Owned Capital Investment and Operation Co Ltd [21.2%]; KEPCO Shanxi International [17.0%]; Shanxi Coking Coal Energy Group Co Ltd [10.0%]; KEPCO Woori sprott Global Prive [4.0%]; Power Development [3.5%]; Shanxi Gemeng International Energy Group Co Ltd [2.4%]; other [2.0%] |
Background
Shanxi Liulin power station originally consisted of four units totaling 1400 MW. The first two units of 100 MW each were put into operation in 1995 and 1996, respectively, at a total investment of 1.1 billion yuan. The units were funded through loans from the Asian Development Bank (ADB).[1][2]
In 2008 two more units of 600 MW each began operation.[3]
New units were also built at the related Liulin Liansheng power station.
Articles and Resources
References
- ↑ "Shanxi Liulin Power Generation Co. Ltd," Shanxi International Energy Group website, accessed October 2014
- ↑ 关于山西柳林联盛煤矸石综合利用电厂二期工程, mee.gov.cn, 2014-08-20
- ↑ "Development History," Shanxi International Energy Group website, accessed October 2014
Additional data
To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.