Sheksna-Kirillov-Lipin Bor-Vytegra-Pudozh Gas Pipeline
Part of the Global Gas Infrastructure Tracker, a Global Energy Monitor project. |
Related categories: |
Sheksna-Kirillov-Lipin Bor-Vytegra-Pudozh Gas Pipeline (Russian: Газопровод-отвод к городам Кириллов, Белозерск, Липин Бор, Вытегра и Пудож) is a partially operating gas pipeline in Russia.[1][2]
Location
Stage I: Sheksna-Kirillov Gas Pipeline
The pipeline is proposed to run from Vologda-20 gas distribution station, near Chyobsara, Vologda Oblast to Kirillov, Vologda Oblast, Russia.
Stage II: Kirillov-Lipin Bor Gas Pipeline
The pipeline is proposed to run from Kirillov, Vologda Oblast to Lipin Bor, Vologda Oblast, Russia.
Stage III: Lipin Bor-Vytegra Gas Pipeline
The pipeline is proposed to run from Lipin Bor, Vologda Oblast to Vytegra, Vologda Oblast, Russia.
Stage IV: Vytegra-Pudozh Gas Pipeline
The pipeline is proposed to run from Vytegra, Vologda Oblast, Russia to Krasnoborsky, Pudozhsky District, Republic of Karelia, Russia.
Project details
Stage I: Vologda-20-Kirillov Gas Pipeline
- Operator: Gazprom Gazoraspredeleniye Vologda [1][3]
- Owner: Gazprom[1]
- Parent company: Gazprom
- Capacity: 0.743 bcm/year[4][5]
- Length: 118.4 km[6]
- Diameter: 500 mm[6]
- Status: Operating[1]
- Start year: 2021[7]
- Cost:
- Financing:
- Associated infrastructure: Gryazovets-Leningrad Gas Pipeline
Stage II: Kirillov-Lipin Bor Gas Pipeline
- Operator: Gazprom Gazoraspredeleniye Vologda [1][3]
- Owner: Gazprom[1]
- Parent company: Gazprom
- Capacity: 0.743 bcm/year[4][5]
- Length: 54.8 km[6]
- Diameter: 500 mm[6]
- Status: Operating[1]
- Start year: 2023[7]
- Cost:
- Financing:
- Associated infrastructure: Gryazovets-Leningrad Gas Pipeline
Stage III: Lipin Bor-Vytegra Gas Pipeline
- Operator: Gazprom Gazoraspredeleniye Vologda [1][3]
- Owner: Gazprom[1]
- Parent company: Gazprom
- Capacity: 0.743 bcm/year[4][5]
- Length: 125.7 km[6]
- Diameter: 500 mm[6]
- Status: Construction[8][9]
- Start year: 2024[9]
- Cost:
- Financing:
- Associated infrastructure: Gryazovets-Leningrad Gas Pipeline
Stage IV: Vytegra-Pudozh Gas Pipeline
- Operator: Gazprom Gazoraspredeleniye Petrozavodsk[2]
- Owner: Gazprom[1]
- Parent company: Gazprom
- Capacity: 0.743 bcm/year[4][5]
- Length: 106.4 km[6]
- Diameter: 500 mm[6]
- Status: Construction[10]
- Start year: 2024[11]
- Cost:
- Financing:
- Associated infrastructure: Gryazovets-Leningrad Gas Pipeline
Background
The pipeline was included in the gasification program of Gazprom for 2021-2025 for the Vologda region and the Republic of Karelia.[1][2] The project was also included in the list of "Planned Transmission Gas Pipelines", released by the Ministry of Energy of Russia in May 2015 and revised in March 2024.[5] The pipeline starts at 126th km of the Gryazovets-Leningrad Gas Pipeline in the Sheksninsky district and connects to segments I and II.[5][6]
The pipeline will consist of four segments: Stage I: Sheksna-Kirillov Gas Pipeline (Russian: 1 этап. Газопровод-отвод от 0 км до ГРС «Кириллов»), Stage II: Kirillov-Lipin Bor Gas Pipeline (Russian: 2 этап. Газопровод-отвод от ГРС «Кириллов» до ГРС «Липин Бор»), Stage III: Lipin Bor-Vytegra Gas Pipeline (Russian: 3 этап. Газопровод-отвод от ГРС «Липин Бор» до ГРС «Вытегра»), and Stage IV: Vytegra-Pudozh Gas Pipeline (Russian: 4 этап. Газопровод-отвод от ГРС «Вытегра» до ГРС «Пудож»).[1][2]
Articles and resources
References
- ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 "Программа газификации 2021–2025 в Вологодской области". Gazprommap.ru. 2022. Retrieved Jul 18, 2024.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 2.0 2.1 2.2 2.3 "Программа газификации 2021–2025 в Республике Карелия". www.gazprommap.ru. 2024. Retrieved July 18, 2024.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 3.0 3.1 3.2 "Генеральный директор АО «Газпром газораспределение Вологда» и Губернатор Вологодчины проверили ход строительства газопровода на западе области". mrg.gazprom.ru. April 7, 2022. Retrieved July 18, 2024.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 4.0 4.1 4.2 4.3 "https://tass.ru/vologodskaya-oblast/3605150?utm_source=google.com&utm_medium=organic&utm_campaign=google.com&utm_referrer=google.com". tass.ru. Retrieved 2022-08-08.
{{cite web}}
: External link in
(help)|title=
- ↑ 5.0 5.1 5.2 5.3 5.4 5.5 "ПЕРЕЧЕНЬ МАГИСТРАЛЬНЫХ ГАЗОПРОВОДОВ, ПЛАНИРУЕМЫХ ДЛЯ РАЗМЕЩЕНИЯ". КонсультантПлюс. March 12, 2024. Retrieved June 24, 2024.
{{cite web}}
: line feed character in|title=
at position 49 (help)CS1 maint: url-status (link) - ↑ 6.0 6.1 6.2 6.3 6.4 6.5 6.6 6.7 6.8 "Основная часть. Том 1". docviewer.yandex.com. August 1, 2018. Retrieved July 18, 2024.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 7.0 7.1 "93% составляет готовность второго этапа строительства газопровода-отвода от ГРС Кириллов до ГРС Липин Бор". www.vologda-oblast.ru. July 24, 2023. Retrieved July 18, 2024.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Новости кириллов новости". drkuchiev.ru. June 26, 2024. Retrieved July 18, 2024.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 9.0 9.1 "Газопровод-отвод, проходящий по территории Вашкинского округа и Вытегорского района, готов на 69%". vologda-oblast.ru. April 27, 2024. Retrieved July 18, 2024.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "На строительство газопровода в Вытегорском районе получена новая техника". vo.rbc.ru. April 9, 2024. Retrieved July 18, 2024.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Строительство крупного газопровод-отвода и 4 ГРС к городам Кириллов-Белозерск-Липин Бор-Вытегра Вологодской области. Программа газификации регионов России". neftegazpro.ru. Retrieved July 18, 2024.
{{cite web}}
: CS1 maint: url-status (link)