Shenhuo Zhundong power station
Part of the Global Coal Plant Tracker, a Global Energy Monitor project. |
Related coal trackers: |
Shenhuo Zhundong power station (神火煤电准东五彩湾煤电铝项目自备电厂) is an operating power station of at least 1400-megawatts (MW) in Wucaiwan Town, Jimsar, Changji, Xinjiang, China. It is also known as Zhundong Shenhuo power station.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Shenhuo Zhundong power station | Wucaiwan Town, Jimsar, Changji, Xinjiang, China | 44.88993, 89.049878 (exact) |
The map below shows the exact location of the power station.
Unit-level coordinates (WGS 84):
- Unit 1, Unit 2, Unit 3, Unit 4: 44.88993, 89.049878
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | Start year |
---|---|---|---|---|---|
Unit 1 | operating | coal: unknown | 350 | supercritical | 2014 |
Unit 2 | operating | coal: unknown | 350 | supercritical | 2014 |
Unit 3 | operating | coal: unknown | 350 | supercritical | 2014 |
Unit 4 | operating | coal: unknown | 350 | supercritical | 2014 |
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
Unit 1 | Xinjiang Shenhuo Coal & Power Co Ltd [100%] | Henan Shenhuo Coal&Power Co Ltd [100.0%] |
Unit 2 | Xinjiang Shenhuo Coal & Power Co Ltd [100%] | Henan Shenhuo Coal&Power Co Ltd [100.0%] |
Unit 3 | Xinjiang Shenhuo Coal & Power Co Ltd [100%] | Henan Shenhuo Coal&Power Co Ltd [100.0%] |
Unit 4 | Xinjiang Shenhuo Coal & Power Co Ltd [100%] | Henan Shenhuo Coal&Power Co Ltd [100.0%] |
Project-level captive use details
- Captive industry use (heat or power): power
- Captive industry: Aluminum
Background
Shenhuo Zhundong power station is a four-unit coal-fired captive power plant with a total capacity of 1,400 MW in Xinjiang Uyghur Autonomous Region. The plant was completed in 2013 and is owned by Henan Shenhuo Group. It is to supply electricity and heat to Shenhuo's aluminum smelter.[1]
Articles and Resources
References
- ↑ 新疆神火项目4×35万千瓦超临界机组工程1号机组通过168小时试运, China 5e, June 4, 2014.
Additional data
To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.