Shenmu–Anping Coalbed Gas Pipeline

From Global Energy Monitor
Part of the
Global Gas Infrastructure Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related categories:
神安管道路线示意图.png

Shenmu–Anping Coalbed Gas Pipeline 神安煤层气输气管线 (神木-安平) is a coalbed gas pipeline in China. It was fully connected on December 1.[1]

Location

The pipeline runs from Shenmu County, Yulin, Shaanxi Province, passing through Kangping station in Xing County, Shanxi, to Anping, Hengshui, Hebei Province. It contains two segments: Shanxi–Hebei Segment, which is running from Xing County to Anping, and Shaanxi-Shanxi Segment, from Shenmu-Xing County.[2]

Loading map...

Shanxi–Hebei Segment 山西-河北段 (兴县-安平)

  • Operator: Zhonglian Huarui Nutural Gas Company 中联华瑞天然气有限公司[3]
  • Parent company: CNOOC (51%), Top Resource Conservation & Environment Corp (49%)
  • Capacity: 5 billion cubic meters per year[4]
  • Length: 543.87 kilometers[5]
  • Status: Operating[6]
  • Start year: 2021[6]
Loading map...

Shaanxi–Shanxi Segment 陕西-山西段 (神木-兴县)

  • Operator: Zhonglian Huarui Nutural Gas Company 中联华瑞天然气有限公司
  • Parent company: CNOOC (51%), Top Resource Conservation & Environment Corp (49%)
  • Capacity: 2 billion cubic meters per year[4]
  • Length: 74.1 kilometers[4]
  • Status: Operating[7]
  • Start year: 2022[7]
Loading map...

Background

Shanxi-Hebei Segment, from Kangping, Lvliang, Shanxi to Anping, Hebei was permitted for construction in June 2019 by China's National Development and Reform Commission. The pipeline's source is the coalbed gas field in Qinshui Basin, Shanxi and Ordos, Inner Mongolia.[5][8] Actual construction began before the pipeline received the permit, and it was initially expected to operate by November 2020.[9][10] The diameter of the pipe is 813mm and the pressure is 8.0MPa.[11]

On July 29, 2021, part of the segment, from Yanzhuang in Lvliang, Shanxi to Luquan in Hebei, totaling 234 km reportedly went into operation.[11][12] On December 1, 2021, Shanxi-Hebei segment was fully connected. [6]

Shaanxi-Shanxi Segment received permit for construction in August 2021.[4]Shaanxi-Shanxi Segment was fully connected and started a trial operation on December 1, 2022.[7]

Articles and resources

References

  1. 中国最长煤层气长输管道神安管道全线贯通, 中国新闻网, 2022-12-01
  2. "Environmental Impact Assessment" (PDF). Archived (PDF) from the original on 2021-09-28. Retrieved 2021-09-28.
  3. "中联华瑞天然气有限公司-启信宝". www.qixin.com. Retrieved 2021-09-15.
  4. 4.0 4.1 4.2 4.3 "【关于神木-安平煤层气管道项目(陕西-山西段)核准的批复(发改能源〔2021〕1257号)】-国家发展和改革委员会". www.ndrc.gov.cn. 2021-08-30. Retrieved 2021-09-15.{{cite web}}: CS1 maint: url-status (link)
  5. 5.0 5.1 天壕环境股份有限公司关于向合资公司中联华瑞天然气有限公司增资的公告, 巨潮资讯, May 11,2020, accessed Aug. 21, 2021.
  6. 6.0 6.1 6.2 2亿方!中海油神安管道(山西-河北段)全线贯通!, 搜狐网, 2021-11-30
  7. 7.0 7.1 7.2 天壕环境:神安线管道项目陕西-山西段正式通气, 中国证券报, 2022-12-01
  8. 神安线输气管道工程项目获国家核准, Top Resource Conservation & Environment Corp., accessed Aug. 21, 2021.
  9. 神安线完工后供气能力增长十数倍 天壕环境或迎业绩拐点 投资者网, Jun. 26, 2020, accessed Aug. 21, 2021.
  10. 每经记者 朱万平, 每经编辑 梁枭, 天壕环境孙公司拖欠工程款, 投建神安线涉嫌未批先建?, 每日经济新闻, Dec. 12, 2019, accessed Aug. 21, 2021.
  11. 11.0 11.1 神木-安平煤层气管道工程项目山西闫庄-河北鹿泉段正式通气, chinapipe.net, Jul. 30, 2021, accessed Aug. 21, 2021.
  12. 天壕环境: 神安线山西-河北正式通气, 未来业绩可期, Jul. 30, 2021, accessed Aug. 21, 2021.

Related GEM.wiki articles

External resources

External articles