Shenzhen Yuhu Gas power station

From Global Energy Monitor
Part of the
Global Oil and Gas Plant Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related categories:

Shenzhen Yuhu Gas power station (龙岗区钰湖电力2×9F级燃气—蒸汽联合循环热电联产扩建项目, 深圳钰湖电力有限公司扩建2×9F级燃气--蒸汽联合循环热电联产项目, 深圳钰湖燃气发电厂) is an operating power station of at least 360-megawatts (MW) in Pinghu Town, Longang District, Shenzhen, Guangdong, China with multiple units, some of which are not currently operating.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Shenzhen Yuhu Gas power station Pinghu Town, Longang District, Shenzhen, Guangdong, China 22.716169, 114.136159 (exact)[1]

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • 1-1, 1-2, 2-1, 2-2: 22.716169, 114.136159

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP Start year
1-1 Operating[1] fossil gas: natural gas[1] 180[2] combined cycle[1] yes[2] 2004[1]
1-2 Operating[1] fossil gas: natural gas[1] 180[2] combined cycle[1] yes[2] 2004[1]
2-1 Pre-construction[3] fossil gas: natural gas[4] 430[4] combined cycle[5][3] yes[5][3]
2-2 Pre-construction[3] fossil gas: natural gas[4] 430[4] combined cycle[5][3] yes[5][3]

CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
1-1 Shenzhen Yuhu Electric Power Co Ltd [100%][5][2] Beijing State-owned Capital Management Center [100.0%]
1-2 Shenzhen Yuhu Electric Power Co Ltd [100%][5][2] Beijing State-owned Capital Management Center [100.0%]
2-1 Shenzhen Yuhu Electric Power Co Ltd [100%][5][2] Beijing State-owned Capital Management Center [100.0%]
2-2 Shenzhen Yuhu Electric Power Co Ltd [100%][5][2] Beijing State-owned Capital Management Center [100.0%]

Background

The Phase I (Unit 1-1 and Unit 1-2) officially started operating in May 2004. In 2015, it successfully achieved combined cooling, heating, and electricity supply through renovation.[6][7]

Articles and Resources

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 https://web.archive.org/web/20220406222229/https://news.bjx.com.cn/html/20180906/926153-5.shtml. Archived from the original on 06 April 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 https://web.archive.org/web/20220406222229/https://news.bjx.com.cn/html/20180906/926153-5.shtml. Archived from the original on 06 April 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  3. 3.0 3.1 3.2 3.3 3.4 3.5 http://www.nengyuanjie.net/article/64459.html. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 4.2 4.3 https://www.3haojob.com/aa/16511001494042.html. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 5.2 5.3 5.4 5.5 5.6 5.7 (PDF) https://web.archive.org/web/20240509014919/http://www.lg.gov.cn/attachment/1/1419/1419536/11166521.pdf. Archived from the original (PDF) on 09 May 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  6. "GE于深圳钰湖电厂完成中国首例9E先进热通道升级". 2017-08-31. Retrieved 2023-11-03.{{cite web}}: CS1 maint: url-status (link)
  7. "广东省57家燃机发电项目 136台机组汇总". 2018-09-06. Retrieved 2023-11-03.{{cite web}}: CS1 maint: url-status (link)

Additional data

To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.